Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Spadina Pier Cofferdam - Design, Installation & Performance
By Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987
-
Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic Loads
By Amy B. Cerato
The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic
Jan 1, 2008
-
Estimation Of Settlements Of Piles In Group
By Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.
By Paul M. Wiltcher
This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas
Jan 1, 2006
-
Secant Pile Shoring - Developments In Design And Construction
By Eric S. Lindquist
High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t
Jan 1, 2011
-
Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6
By Daniel Mageau
Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case
Jan 1, 1998
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls
By B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017
-
The Effect Of Overburden On Pile Capacity In A Calcareous Marl
By William M. Camp
An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet
Jan 1, 1993
-
LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test
By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles
"This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te
Jan 1, 2017
-
Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? Synopsis
By X. L. Huang
This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m
Jan 1, 2010
-
Underground Parking Facilities In Rotterdam
By Henk E. Brassinga
In Rotterdam a number of underground parking facilities have been built and are under development in the inner city, and in the suburbs. These parking facilities are located at already densely built a
Jan 1, 2006
-
Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles
By Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
High Capacity And Fully Removable Soil Anchors
By Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis
By Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Recent Advances In Soil Nailed Earth Retention
By Tom A. Armour
Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&
Jan 1, 2003
-
Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam
By Thomas Passlick
By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as
Jan 1, 2006
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat
By Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary
By Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology
By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014