Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Abatement of Acid Mine Drainage in Ontario
By John R. Hawley
"This paper is intended as a review of the progress that has been made in the Province of Ontario in the field of acid drainage waste treatment technology.Three years ago, at the Third Annual Meeting
Jan 1, 1974
-
Flotation as Part of Grinding Classification Circuits
By M. Tarvainen, J. Kallioinen
"Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r
Jan 1, 1984
-
Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support
By J. Sliwinski, J. Oliveira
"The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo
Jan 1, 2013
-
EKATI Safety Guarantee A Conversation for an Extraordinary Possibility
By Richard Morland
Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm
May 1, 2010
-
Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation
By Colin Hardie, Erik Bartsch, Guy Comeau
"The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade
Jan 1, 2008
-
Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving
By C. O?Connor
With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e
May 1, 2007
-
The Metso Mp1250 Cone Crusher ? Two Case Studies
By D. A. Jacobson
Mining operations, whether new or existing, are constantly looking for ways to maximize production and improve energy efficiency, while keeping the footprint required to a minimum. The Nordberg MP1250
Jan 1, 2012
-
Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)
By P. K. Frempong, S. D. Butt
"A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no
Jan 1, 2004
-
Geostatistical resource estimation for the Poura narrow-vein gold deposit
A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov
Feb 1, 2004
-
Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal Values
By W. Curlook, V. G. Papangelakis, M. Baghalha
A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt
Jan 1, 2004
-
Lac Minerals Development of Hemlo
By C. Patel, George H. Hope
"INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an
Jan 1, 1985
-
Using the SUPASIM Flotation Model to Diagnose and Understand Flotation Behavior from Laboratory through to Plant
By M. P. Hay
"For a model to be successful it must address the concerns and needs of a target audience. Further, the model must demonstrate the same patterns of behaviour as the real system, and need only be compl
Jan 1, 2005
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine
By D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
Stabilization of Arsenic in the Mining and Metallurgical Industries ? A Review
By Sengpasith Houngaloune
Arsenic, which is a toxic and carcinogenic element, causes serious environmental problems throughout the world. It is also known as a major contaminant in the non-ferrous mining and extractive metallu
Aug 1, 2013
-
The Use of a Laboratory Centrifugal Separator to Study Gravity Recovery in Industrial Circuits
By Y. Shu, A. R. Laplante
"A laboratory Knelson Concentrator (LKC), 7.5 cm in diameter, was used to study the performance of a similar unit at plant scale, 76 cm in diameter, This paper reports on sampling and assaying procedu
Jan 1, 1992
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines Limited
By P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
GHG Emissions in the Mining, Metallurgy and Petroleum Sectors
By Pierre Boileau
Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min
Nov 1, 2002
-
25 Years of Collector Development for Sulphide Mineral Flotation
By B. S. Fee, R. R. Klimpel
"Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other
Jan 1, 1987
-
Potash Processing - A Review
By A. F. Banks
"The last time I spoke to you the potash industry was at a low point. Markets were bad and the industry depressed. Many people had left and there was very little being done in terms of development. Th
Jan 1, 1982
-
Process Development for Milling B-Zone Ore at Rabbit Lake
By S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988