Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Milling Operations at Omai Gold Mines

    By Eric Konigsmann

    "Omai Gold Mines is a large scale open pit gold mining operation located in central Guyana, South America with a 12,000 tonne per day milling facility. Mill operations were initiated in December 1992

    Jan 1, 1994

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Welding developments for Arctic structures

    By J. G. Price

    "The paper reviews state-of-the art welding processes and consumables for structural and pressure equipment applications in offshore environments, particularly the Arctic. Optimum selection of consuma

    Jan 1, 1987

  • CIM
    Balancing and Estimating the Ore Mineral Contents from Daily Production Samples

    By Maryam Sadeghi, Jonathan Roy, Claude Bazin

    "The operation of mineral processing equipments is intimately related to the mineral composition of the ore. However unit performances are usually characterized in terms of metal contents or recoverie

    Jan 1, 2016

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Selection of rock depressants based on laboratory kinetic studies

    By Gordon E. Agar, Brian Lyons, Gregory H. Styles, William B. Kipkie

    "Rock rejection during the flotation of a copper-nickel ore was improved by adding carboxymethyl cellulose to both a rougher and cleaner flotation stage. The selection of the rock depressant was based

    Jan 1, 1987

  • CIM
    Designing Science Based Effluent Permits for the Mining Industry

    The goal of this presentation is to firstly, review mine effluent permits in a number of regulatory jurisdictions; and secondly, to develop a strategy for incorporating the regulatory requirements int

    Aug 1, 2013

  • CIM
    Low-Grade Geothermal Potential of the Regina - Moose Jaw Area, Saskatchewan

    By L. W. Vigrass

    Porous and permeable rocks deeply buried in sedimentary basins contain immense volumes of hot water with the potential to supply low-grade heat energy. A part of Canada with sizeable potential for low

    Jan 1, 1979

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    CMIC-NSERC Footprints Project: A Roadmap for Large Project Development and Implementation

    By Alan Galley

    CMIC Mandate CIM Annual Meeting, Toronto, May 6, 2013 To increase mining research, innovation and commercialization efforts in order to strengthen Canada?s pre-eminent role as a global leader in min

    May 1, 2013

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002

  • CIM
    Flotation and Hydrometallurgy Research on Brunswick Tin Mine Ores

    By E. W. J. Thornton

    During the past six or seven years extensive research has been performed on ore samples procured at the Bruns1,vick Tin Mines which is located in the south-west corner of New Brunswi.ck. This property

    Jan 1, 1977

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Rubber Lining Design for Grinding Mills: Influence on Economy and Capacity

    By Gustav Nillson

    There is a difference in design parameters between steel linings and rubber linings for grinding mills. The basic design parameters for rubber are described and a comparison is made between steel and

    Jan 1, 1979

  • CIM
    Burr Project Potash Mine Development

    Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth

    May 1, 2009

  • CIM
    SEM-XMAP: Scanning Electron Microscopy and X-Ray Dot-Mapping Applied to Cemented Paste Backfill

    By Serge Ouellet

    Identification and quantification of cementitious phases in cemented paste backfill (CPB) is difficult due to the fineness of tailings and the low binder content used in the mixture. Techniques such a

    May 1, 2007