Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Large Flotation Cell Operation at Falconbridge Copper Limited – Opemiska Division

    By J. R. Maxwell

    In 1970 expansion was completed increasing mill capacity from 2,000 to 3,000 T.P.D. Actual grinding capacity is 3,400 T,P,D. at a grind of 60% -200 mesh,The ore bodies are vein type, containing about

    Jan 1, 1974

  • CIM
    Demonstration heap leaching

    By G. W. McDonald

    "The mineralogical studies done on Hope Brook ore samples indicated that a heap leach gold recovery process may be possible. In the metallurgicalprogram that followed, column tests confirmed this inte

    Jan 1, 1989

  • CIM
    Increased Production Through Improved Spare Parts Availability

    By Robert Lamarre

    In today?s environment, the availability of production equipment is a must to increase throughput and profits. For a number of mining organizations around the world, spare parts availability is key to

    Aug 1, 2013

  • CIM
    Geology of the Palladium-rich Legris Lake Mafic-Ultramafic Complex, Western Wabigoon Subprovince, Northwestern Ontario

    By Kéiko H. Hattori, Neil T. Pettigrew

    "Abstract- The Legris Lake Complex is a northeast-trending, 7.3 km long by 3.5 km wide, maficultramafic intrusive complex located in the western Wabigoon Subprovince of the Archean Superior Province.

    Jan 1, 2001

  • CIM
    Influence of Low Iron Inputs on Impurity Co-Precipitation in Teck’s Iron Removal Processes at Trail Operations

    By B. R. Neufeld, M. G. Heximer, S. J. Roach, W. G. Van Luven, D. G. Reynolds

    "Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. In the zinc plant, zinc concentrates are roasted to produce calcine, which is then processed in the leac

    Jan 1, 2016

  • CIM
    Deep-Seated Structurally Controlled Landslides of Corinth Gulf Rift Zone, Greece: The case of Panagopoula Landslide

    By S. Papanakli, Th. Rondoyanni, N. Sabatakakis, K. Kavoura, G. Tsiambaos

    "A representative composite fault-related landslide of the Corinth Gulf graben named “Panagopoula” is reported that considered to be one of the most prone to slope instability sites along the main mot

    Jan 1, 2015

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - VOLCANIC ISLAND ARCS - Hydrothermal Fluid Evolution and Ore-forming Processes of Submarine Hydrothermal Systems in the Okinawa Trough

    By Qiling Zhang, Zengqian Hou, Xiaoming Qu

    Abstract - The Okinawa trough is an active back-arc-spreading center in which submarine hydrothermal exhalation (black chimneys) and sulfide mineralization are forming. Fluid inclusion composition in

    Jan 1, 1999

  • CIM
    Ecological Engineering – interpretation of hydrogeochemical observations in a sulphide tailings deposit

    By R. G. L. McCready, R. O. van Everdingen, M. Kalin, R. van Everdingen

    "This paper is based on data generated between October, 1986 and October, 1989, during the implementation of an Ecological Engineering close-out for a zinc mine in Northern Ontario, where 690000 tonne

    Jan 1, 1992

  • CIM
    Hot gunning of TBRCs at Inco

    By P. M. Tyroler, W. J. Thoburn, M. R. Alberty

    "An initial test of this unique application demonstrated that hot gunned refractory would adhere satisfactorily. Subsequently, it was found that the proportion of material sticking during application

    Jan 1, 1981

  • CIM
    Automatic Dumping Cage at the Coniaurum Mine

    By L. G. Morrell

    Introduction A Self-Dumping cage which combines the features of a small skip and a cage has been used in a vertical winze between the 2,000 and 2,500 levels at the Coniaurum mine for the past three y

    Jan 1, 1933

  • CIM
    Lithological interpretation based on monitored drilling performance parameters

    By J. Peck, M. J. Scobie, M. D. Pollitt

    "IntroductionOne aspect of current research in the Canadian Centre for Automation and Robotics in Mining (CCARM) involves the automatic identification of different rock types based on particular drill

    Jan 1, 1991

  • CIM
    What Happened on the Road to Rare Earth Success? (How did the yellow brick road end up as fool’s gold?)

    By Neillm Alastair S.

    "This paper looks at what has happened in the past decade in the rare earth industry, particularly for those companies outside China trying to develop alternative projects to the Chinese dominated sup

    Jan 1, 2016

  • CIM
    PED - an improvement in mine communications

    By S. L. Gula

    "Effective and timely communication during routine operations, and especially during emergency situations, is no easy task in any underground mine. At Cominco Fertilizers, Potash Operations, where 150

    Jan 1, 1993

  • CIM
    A New Device to Enhance Oxygen Dispersion in Gold Cyanidation

    By Ralph Harris, Javier Jara

    "Oxygen is essential in gold cyanidation. It is supplied to the leaching media by sparging oxygen or compressed air into the cyanidation tank. The rate of oxygen transfer is critical to achieve the de

    Jan 1, 1994

  • CIM
    Computer-aided dynamic analysis and control design for grinding circuits

    By Daniel Hodouin, Robert Lanthier, Yve Dube

    "A procedure f or constructing a grinding mill dynamic model is proposed. This model is used in a dynamic simulator of are grinding circuits. The simulator is designed for flexible flow sheets involvi

    Jan 1, 1987

  • CIM
    Les Mines Selbaie Story Underground mining

    By Yve Fourmanoit

    "This paper discusses the exploitation of shallow underground deposits in a very altered geological environment. The methods, their adaptation to local conditions, their evolution, dilution control an

    Jan 1, 1990

  • CIM
    Simulation of the Bond grindability test

    By V. K. Karra

    "A simplistic algorithm jar simulating the rod or ball mill Bond grindability test applied to ores and minerals is presented. A performance comparison between the present algorithm and a previously pu

    Jan 1, 1981

  • CIM
    Experimental Measurements of the Copper Electrowinning Behavior and Current Efficiency Pre and Post Shorting

    By Michael L. Free, Zongliang Zhang, Joshua M. Werner

    In the copper electrowinning process, short-circuiting between the anodes and the cathodes is a critical problem that changes the current allocation among local electrodes and reduces the current effi

    Jan 1, 2019

  • CIM
    Model-based Improvements at the Sarcheshmeh Copper Mine

    By S. Banisi, M. Pourkani, A. R. Laplante, A. Partoazar

    "Canadian experience in industrial modeling of grinding, classification, and flotation kinetics was applied at the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9 % Cu, in an effort

    Jan 1, 1998

  • CIM
    Bioleaching of a Refractory Gold-Bearing Ore by Thiobacillus Ferrooxidans: An Integrated Approach on the Role of Gold Mineralogy

    By Umbreen Agha, Stephan L. Chryssoulis, A. Margaritis

    "The deportment of gold in samples of the biooxidation feed and product from the Harbour Lights mine in Western Australia was determined using optical microscopy and microbeam techniques such as Secon

    Jan 1, 1996