    The Endako molybdenum mine, central British Columbia: An update

    By G. D. Bysouth, G. Y. Wong

    "The Endako molybdenum deposit is located 160 km west of Prince George, British Columbia. It occurs within the main body of the Francois Lake Intrusions, a composite batholith consisting of early, mid

    Jan 1, 1995

  • CIM
    A Report on Improvements in Drilling and Blasting Practices at IOC?s Carol Lake Project

    By M. H. Pelley

    To increase drill fleet capacity and meet increased ore demands at its Carol Lake Project, the Iron Ore Company of Canada initiated a program in 1975 to convert the Gardner-Denver 120 and Bucyrus-Erie

    Jan 1, 1978

  • CIM
    Influence of Surface Roughness on the Time-Scale of Three Phase Contact Formation by Bubble Colliding with Hydrophobic Solid

    By M. Krasowska

    Dynamics of collision and kinetics of the bubble attachment to hydrophobic solid plates (Teflon) of different surface roughness were investigated. The experiments were carried out in such a way that p

    Jan 1, 2006

  • CIM
    BRAZIL - The Vazante Zinc Mine, Minas Gerais, Brazil: Constraints on Willemitic Mineralization and Fluid Evolution

    By Rodnei Graça, Jorge Silva Bettencourt, Lena Virgínia Soares Monteiro, Baruch Spiro, Tolentino Flávio De Oliveira

    Abstract - The Vazante Mine is located in the Vazante District, the largest zinc district in Brazil. The Vazante deposit consists dominantly of an unusual willemitic ore. Small sulfide bodies are tect

    Jan 1, 1999

  • CIM
    Status of IOCG Exploration in Canada

    By Tom Setterfield

    Conclusions ?Canada is a prospective place to explore for IOCG deposits ?Time distribution of IOCG mineralization in Canada mimics that in the rest of the world ?Canada may have been the first coun

    May 1, 2006

  • CIM
    High Temperature PDX of Precious/Base Metal Concentrates from Newmont's Phoenix Project, Using Controlled Precipitation of Sulphate Species to Enhance Silver Recovery

    By J. C. Gathje

    Newmont acquired the Phoenix Project through the acquisition of Battle Mountain Gold in 2000. Shortly after the acquisition, Newmont Metallurgical Services (NMS) and Nevada Operations began developmen

    Jan 1, 2004

  • CIM
    The Stratigraphy and Oil and Gas Prospects of East-Central Alberta

    By G. S. Hume

    THE Plains of east-central Alberta herein described embrace an area from Viking east to the Saskatchewan boundary and from North Saskatchewan river south to Coronation and Monitor (Figure 1). By far t

    Jan 1, 1937

  • CIM
    Risk Discounting: The Fundamental Difference between the Real Option and Discounted Cash Flow Project Valuation Methods

    By Michael Samis

    The real option valuation method is often presented as an alternative to the conventional discounted cash flow (DCF) approach because it is able to recognize additional project value due to the presen

    May 1, 2003

  • CIM
    Discount rates and risk assessment in mineral project evaluations

    By Lawrence Devon Smith

    "The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied

    Jan 1, 2003

  • CIM
    Waste Rock Disposal to Improve the Geotechnical and Geochemical Stability of Piles

    Waste rock extracted from a mine is typically stored nearby on the surface. Such waste rock piles must be designed to ensure their geotechnical and geochemical stability during the mine operation and

    Aug 1, 2013

  • CIM
    Development of a Process for the Treatment of Electric Arc Furnace Dust and Other Urban Mining Wastes

    By T. Hofbauer, M. J. Dry, G. B. Harris, C. W. White

    "Urban Mining is a term that is increasingly being used, and represents an appreciable source of secondary materials for the metals extraction industry, a source that does not incur mining costs, but

    Jan 1, 2014

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • CIM
    Determination of Gas Transport Characteristics of Fractured Rock by In-Situ Borehole and Chamber Gas-Injection Tests

    By S. Shimaya, T. Maejima, M. Shimo

    "The authors conducted the in-situ gas-tightness tests in a fractured rock at the Namikata underground LPG storage site in Ehime prefecture, Japan. The test consisted of two independent setups, a gas-

    Jan 1, 2015

  • CIM
    Enzyme leach-based soil geochemistry of the Mountain Lake Diatreme, Alberta

    By D. Roy Eccles

    A multi-element geochemical response, with contrasts of up to 29 times background, was obtained in soil above the Mountain Lake Diatreme, northwestern Alberta. The overall geochemical signature is ind

    Jan 1, 2001

  • CIM
    In Situ Monitoring of Cemented Paste Backfill Pressure to Increase Backfilling Efficiency

    By M. W. Grabinsky, B. D. Thompson

    ABSTRACT: Use of cemented paste backfill (CPB) offers economic and environmental advantages over other backfill methods. However, many operations have limited knowledge of how their CPB behaves in sit

    Jan 1, 2011

  • CIM
    Block Stability Analysis of Left Bank Slope of Beihetan Hydropower Station in Jinshajiang River, China

    By G. Rong, W. Du

    Stability of some potential unstable blocks in the left bank slope of Baihetan hydropower station is evaluated in this paper using the three-dimensional (3D) limit equilibrium method. The Baihetan hyd

    Jan 1, 2015

  • CIM
    Backfilling at the Sullivan Mine

    By C. D. M. Chisholm

    IN discussing stope filling, or backfilling, at the Sullivan mine, at Kimberley, B.C., a brief description of the problem will first be presented. The Sullivan orebody is a replacement in quartzite, w

    Jan 1, 1941

  • CIM
    Sustainability in the Steel Industry: The potential and results of Biochar applications for iron ore pellet plants

    By Michelia Alba, Ronaldo S. Sampaio, Davi S. Braga, Mathieu Dubé

    Climate change is pressuring industries and governments for decarbonization commitments, research, testing, and use of best practices to achieve the target of global warming below 1.5/2 °C. As it acco

    Jan 1, 2023

  • CIM
    Statistical Models for Porphyry-Copper-Molybdenum Deposits of the Cordilleran Belt of North and South America

    By Wignall. T. K., J. De Geoffroy

    Statistical models are fitted to the observed distributions of eighteen characteristics of the population of commercial porphyry deposits of North and South America. The statistical base required for

    Jan 1, 1973

  • CIM
    The Effect of Increased Classification Capacity at the Allenby Concentrator

    By Walter Nelson

    Considerable thought and discussion had been devoted toward provision for increased milling capacity at the Allenby concentrator of The Granby Consolidated Mining, Smelting and Power Company operation

    Jan 1, 1950