Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    Problem Identification for Low Gold Recovery and Application of Treatment at Somita Plant

    By B. Roy

    The Somita plant processes low sulphide gold ore in Burkina Faso with a CIL process. After experiencing recurrent low gold recoveries, Somita undertook an investigation on the source of the problem. C

    Jan 1, 2014

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    The Effect of Grinding Media Performance on Milling and Operation Behaviour

    By Don Langlois, Udo Weber

    "The effect of grinding media performance on milling and operational behaviour was demonstrated under different selected milling conditions of calcium carbonate. A variety of grinding media material a

    Jan 1, 2009

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case Study

    By Peter A. Eshun

    This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff

    May 1, 2004

  • CIM
    Development of a Mathematical Programming Model to Support the Planning of Short-Term Mining

    By Camilo I. Morales

    At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same

    Oct 1, 2009

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • CIM
    Labour Market Intelligence; An update for the Canadian Mining Industry

    OVERVIEW OF PRESENTATION ? What is LMI ? Who uses LMI and how? ? Value of LMI to the Mining Industry ? Mining Industry Workforce Information Network (MIWIN) ? The Challenge: Forecasting the futur

    May 1, 2009

  • CIM
    Establishing the Best Practice Guidelines in Mineral Processing for NI 43-101

    By Tony Lipiec, Chris Fleming, Larry Urbanoski

    In 2009, the Canadian Mineral Processors (CMP) became aware that Canadian securities regulators were amending the contents of National Instrument 43-101. NI 43-101 is a set of regulations which establ

    Jan 1, 2011

  • CIM
    The Economics of Individually Motorized Rail Cars in Block Caving Operations

    By Scott A. Stebbins

    Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera

    Nov 1, 2011

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Switched Reluctance Drive: The Ideal Feeder Drive

    By Svato Prochazka

    Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?

    May 1, 2010

  • CIM
    Aeration in Plant Practice

    By K. V. Konigsmann

    "The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m

    Jan 1, 1973

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009