Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Thinking Outside the Lease - Towards a Strategic View of Regional Water Management by the Mining Industry

    In the last 30 years, human appropriation of global renewable resources has accelerated to the point where 35 per cent of the earthÆs land surface is now in managed agro-ecosystems, consumptive water

    Jan 1, 2009

  • AUSIMM
    Education and the Role of Geotechnical Professionals in the Mining Industry

    The Australian mining industry faces skills shortages across a broad spectrum of disciplines and levels, as it enters another major growth phase. Critical amongst the areas of most significant shortag

    Nov 25, 2010

  • AUSIMM
    ArriumÆs Iron Baron Hematite Beneficiation Plant - A Success from Start to Finish

    By M Bannear, C Stanton

    Since 2008, Arrium has been developing and commissioning a new low-grade hematite ore benefication plant (or OBP) at its Iron Baron mine site.The Iron Baron mine, which was closed in the 1990s, could

    Aug 12, 2013

  • AUSIMM
    Australian Rock Bolt Steel Chemistry and Stress Corrosion Cracking

    It's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a

    Nov 25, 2010

  • AUSIMM
    Desperate Times Call for Desperate Measures - The Use of Sea water in Mineral Processing

    The expansion of hydrometallurgical operations, declining ore grades and upwardly spiralling production increases the demand for fresh and recycled water with low levels of contaminants. The minerals

    Jun 1, 2010

  • AUSIMM
    Methods of Restoring New Zealand Native Forests after Mining

    By C Ross

    This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe me

    Jan 1, 1995

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • AUSIMM
    Water as Risk in Mining – Media Analysis and the RISKGATE Body of Knowledge

    By J Harris, M Shi, S Vink, P A. Kirsch

    Across the life-of-mine, water is both an essential commodity to mining, and one of the most significant hazards. In Australia, a land of drought and floods, availability of water is a critical strate

    Jul 16, 2014

  • AUSIMM
    Reverberatory Smelting Plant, Mount Morgan

    During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States

    Jan 1, 1939

  • AUSIMM
    Green Policies at Home and Abroad

    Green policies have gained momentum since the 1972 Stockholm, Environment Conference. The environmental movement has influenced political initiatives both in New Zealand and abroad. Governments and in

    Jan 1, 1990

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013

  • AUSIMM
    Spontaneous Combustion and Simulation of Mine Fires and Their Effects on Mine Ventilation Systems

    By H W. Wu, D Humphreys

    The structure of a comprehensive research project into mine fires study applying the Ventgraph mine fire simulation software, preplanning of escape scenarios and general interaction with rescue respon

    Jan 1, 2005

  • AUSIMM
    Enhanced Drilling in Rio Tinto

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation is to improve the accuracy and consistency of mining processes and less

    May 1, 2010

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • AUSIMM
    Drilling Equipment for Difficult Coring Conditions A New Type Core Lifter and Triple Tube Core Barrel

    Considerable improvements in diamond drilling equipment have been made since the early 1950s. A recent drilling programme, however, at Williamtown, near Newcastle, carried out by the Joint Coal Board

    Jan 1, 1967

  • AUSIMM
    The Hydraulic Transportation of Sands

    Factors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical

    Jan 1, 1959

  • AUSIMM
    Fly-In, Fly-Out Operations ù Strategies for Managing Employee Well-Being

    By J Sibbel, K Goh

    A key issue facing mine managers in remote locations in Australia and overseas is that of managing a fly-in, fly-out (FIFO) workforce. Current Australian research (Sibbel, in prep) indicates that FIFO

    Jan 1, 2006

  • AUSIMM
    Rutile Beach Sand from Hard Rock

    Rutile Beach Sand from Hard Rock

    Sep 13, 2010

  • AUSIMM
    Ventilating Metalliferous Mines: A Method of Attack Part II

    THE following really forms the second part of, or a sequel to, a paper, " Ventilating Metalliferous Mines: a Method of Attack," read before the Broken Hill Branch of the Australasian Institu

    Jan 1, 1923

  • AUSIMM
    Philosophy of Slope Design: A Case Study of Geotechnical Investigations at Macraes Flat Gold Mine

    Site specific geotechnical data, deposit characteristics and method of mining are key factors when assessing an appropriate slope design philosophy. Mining geotechnics should be viewed as an iterative

    Jan 1, 1992