Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development and Testing of a New Roof Prop

    By E. Bane Kroeger

    In underground coal mining, there is often a need for supplemental support for mine openings. In the past, one of the most common types of supplemental support was wooden posts that were installed aga

    Jan 1, 2005

  • SME-ICGCM
    Mechanisms of Rib Sloughing and Methods of Controlling Thick Bolted Ribs

    By Shuangsuo Yang

    Coal ribs can roughly be divided into three types: (1) roof and floor rocks are similar to ribs, (2) roof and floor rocks are stronger than ribs, and (3) roof and floor rocks are weaker than ribs. Dif

    Jan 1, 2005

  • SME-ICGCM
    Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry Modification

    By Luis Giraldo

    Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout

    Jan 1, 2005

  • SME-ICGCM
    Assessment of Ground Conditions Near a Mine Portal Using Ground Penetrating Radar

    By Michael Trevits

    The NIOSH Lake Lynn Laboratory (LLL) is a unique research facility, located about 50 miles southeast of Pittsburgh, Pennsylvania, that is designed to provide a full-scale mining environment for testin

    Jan 1, 2005

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Analysis of Entry Stability Associated with Multi-seam Mining - A Case Study

    By Jisheng Han

    Interaction effect exists when two or more neighboring seams are mined. The mining activity in one seam causes stress redistribution and strata movement in both the roof and floor. When the thickness

    Jan 1, 2005

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Chemical Destressing to Alleviate Rockbursts

    By S. P. Singh

    Destress blasting is commonly used in the mines to minimize the occurrence of rockbursts. The fracturing created by destressing in the vicinity of the face reduces the stress concentration by pushing

    Jan 1, 1987

  • SME-ICGCM
    Roof Control and Roadway Support Design in the #9 Coal Seam, Wuhushan Coal Mine, China

    By Yundong Ma

    In this paper the dynamic process of rock deformation and failure in the roadways of the #9 coal seam, Wuhushan Coal Mine by was simulated using the software "Rock Failure Process Analysis System (REP

    Jan 1, 2005

  • SME-ICGCM
    Evaluation of Rock Burst in Deep Coal Mining By Using the Forensic Engineering

    By Saeed Zhandi, Behdeen Oraee

    "Rock bursts remain an important problem in longwall coal mining. These bursts are due to a sudden and severe failure of rocks from a high stress concentration in deep underground excavations that occ

    Jan 1, 2015

  • SME-ICGCM
    Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry Roof

    By Wenjun Ju

    It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring

    Jan 1, 2001

  • SME-ICGCM
    Depillaring and Roof Bolting Practices at Quinsam Coal Mine

    By Kresho Galovich

    Quinsam Coal Mine located in Vancouver Island, BC, Canada is mining the No. 1 coal seam at the 2 North/3 North mine and the No. 3 coal seam at 4 South Mine. This paper describes its geology and struct

    Jan 1, 2005

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    A System to Provide Early Warning on Impending Goaf

    By Gift Makusha

    Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa

    Jan 1, 2005

  • SME-ICGCM
    Effects of Draw Slate Thickness on Longwall Mining

    By Jun Lu

    The Pittsburgh seam is the most extensively mined coal bed in the Appalachian Basin. Unlike most other prominent coal seams, the Pittsburgh seam typically includes a sequence of immediate roof coals a

    Jan 1, 2013

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports

    By J. A. Nemcik

    Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein

    Jan 1, 1995

  • SME-ICGCM
    Mining-Induced Stress Measurement With Hydraulic Borerole Pressure Cells

    By Paul A. Lu

    This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t

    Jan 1, 1984

  • SME-ICGCM
    A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal Pillars

    By Yunxin Qiu

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp

    Jan 1, 1992