Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Novel Ground Control Program at Plateau Mining Company

    By Hamid Maleki

    A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble

    Jan 1, 1987

  • SME-ICGCM
    Application of Yieldable and Cuttable Pump Crib in Longwall Recovery Room

    By Quanzhong Gu

    Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room

    Jan 1, 2004

  • SME-ICGCM
    Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems

    By Reha Ozel

    The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three

    Jan 1, 1990

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • SME-ICGCM
    Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)

    By Rao Pothini

    Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under

    Jan 1, 1992

  • SME-ICGCM
    Research on the Geological Dynamic Conditions and Forecast for Rock Bursts

    By Weihua Song, Hongwei Zhang, Feng Zhu, Sheng Li, Guoshui Tang

    "Rock burst is one of the most serious dynamic disasters in coal mining. Rock burst prevention involves two difficult tasks: systematically evaluating the occurrence conditions and effectively forecas

    Jan 1, 2015

  • SME-ICGCM
    Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)

    By Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

    Jan 1, 1999

  • SME-ICGCM
    Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its Application

    By Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu

    "A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand

    Jan 1, 2016

  • SME-ICGCM
    Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

    By Tom Vandergritft

    With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall

    Jan 1, 2005

  • SME-ICGCM
    Research And Application Of Combined Reinforcement System

    By Binchuan Zhang

    The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding

    Jan 1, 2001

  • SME-ICGCM
    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    An Investigation into the Support Systems in South African Collieries

    By A. Wilkinson

    An investigation into the performance of support systems that are currently used in South African coal mines was conducted. Five most critical components of a support system have been identified. Thes

    Jan 1, 2005

  • SME-ICGCM
    Shear Bond Characteristics in Grouted Cable Bolts

    By Jian Yong Chen

    The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o

    Jan 1, 2005

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Multi?Seam Mining Over Old Workings with Small Pillars - A Case Study

    By Peter Zhang

    Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough

    Jan 1, 2014

  • SME-ICGCM
    Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)

    By Thomas Barczak

    Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application

    Jan 1, 2005

  • SME-ICGCM
    Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling

    By Wei Yin, Yu Wu, Xiexing Miao

    "For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in

    Jan 1, 2015

  • SME-ICGCM
    Basics on the Dimensioning and the Extraction of Shaft Safety Zones

    By Anton Sroka

    The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th

    Jan 1, 2005

  • SME-ICGCM
    A New Rock Bolting Concept For Underground Roadways

    By G. Skybey

    The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi

    Jan 1, 1992