Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal
By Dion Pastars
Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the
Jan 1, 2007
-
A Method for the Selection of Rock Support Based on Bolt Loading Measurements
By Stephen P. Signer
A method to assist in the evaluation and selection of roof bolts using in situ measurements of roof bolt loading has been developed by researchers of the Spokane Research Center, National Institute of
Jan 1, 1997
-
The Effect Of Hazardous Geologic Structures On Gateroad Stability
By Frank E. Chase
Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g
Jan 1, 1990
-
Determination Of Classification Parameters For Clay - Bearing And Stratified Rock Mass
By Erdal Unal
In underground mining today, safety and economical aspects demand a better understanding of the rock-mass conditions, particularly for design of underground mine openings excavated in weak and stratif
Jan 1, 1990
-
Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)
By Shosei Serata
Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in
Jan 1, 1984
-
Strata Mechanics Of Pillar Extraction Goaf Edges (001afab8-c7ac-48fa-af96-b8de57c1318e)
By John Shepherd
Pillar extraction carried out using various methods (split and lift, Wongawilli and old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting off
Jan 1, 1992
-
Continuing Development of Innovative Cable Support Systems
By John G. Oldsen
Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new
Jan 1, 1997
-
The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support
By Ross Seedsman
Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th
Jan 1, 2001
-
Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)
By Brian White
Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p
Jan 1, 2002
-
Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)
By Douglas Scott
Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research
Jan 1, 2004
-
Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions
By Hui Chen
The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en
Jan 1, 1993
-
Weatherability Test of Rocks for Underground Mines
By Kot F. Unrug
The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit
Jan 1, 1997
-
Improving Roof Control At A South African Coal Mine
By Alan Bugden
Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and
Jan 1, 2001
-
Comparison of Closure Measurements with Finite Element Model Results in an Underground Coal Mine in Central Utah
By Jessica M. Wempen, William G. Pariseau, Michael K. McCarter
"Quantitative analysis of mine-wide subsidence at the kilometer scale and details of stress distribution about an advancing longwall face are estimated using an adaptation of the finite element method
Jan 1, 2018
-
Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)
By John A. Rusnak
Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a
Jan 1, 2000
-
Evaluation Of Support Performance In A Highly Stressed Mine
By Hamid Maleki
The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5
Jan 1, 1994
-
Support Selection For The Multi-Lift Mining Method
By Claude A. Goode
Large quantities of high grade coal exist in thick seams in the United States. Many of these thick seams are too deep to be surface mined and do not lend themselves readily to underground extraction.
Jan 1, 1981
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability
By Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Ground Control Design For Multiple Seam Mining Using Finite Element Analysis
By John Stankus
Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre
Jan 1, 1999
-
Assessment Of Underground Structural Design
By Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990