Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Flyrock Elimination Program Part 1: Corporate Initiative

    By Scott Scovira

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    The 8 Millisecond Rule is Dead – Or Is It?

    By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley

    The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t

    Jan 21, 2025

  • ISEE
    Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)

    By Sandy Tavelli, Thomas L. Barkley

    This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004

  • ISEE
    JKVBOC Blast Movement Model Applications for Ore Control at Open Pit Mines

    By Constanza Bujes, Mark Jones, Graham Crook, Yansan Jamyanbaatar, Sedat Esen

    Tracking ore characteristics such as grade and hardness from its original position into the material handling and processing stages remains one of the key challenges in open pit mining of hard rock de

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • ISEE
    Controlled Blasting Technology for Tunnel Crossing Under High-speed Rail in Small Distance

    By Weiying Zeng, Shouwei Wang, Jinbei Zhong, Xiangdong Meng, Lingtian Meng

    "Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be

    Jan 1, 2017

  • ISEE
    Journal: Summary of Amendments of ADR concerning the Transport of Explosive Materials in the EU

    By Rolf Schillinger

    Transport of Small Quantities of Explosives Material on Public Roads The transport of dangerous goods on public roads is extensively regulated by EU and national law. The transport of explosive materi

    Jan 1, 2010

  • ISEE
    Regression Model for Surface Vibrations from Underground Operations

    By Tristan Worsey, Nathan Rouse, Daykin Schnell

    The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li

    Feb 1, 2020

  • ISEE
    Damage to Rock: Near Field Seismic Models Revisited

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is

    Feb 1, 2020

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    Where the Rubber Meets the Rock

    By Michael Twomey, Alastair Torrance, Alan Twomey

    Low density explosives have been available in various forms for nearly 20 years. These initially consisted of various diluted forms of ANFO formulated to slow the rate of reaction. One such product th

    Jan 1, 2011

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates

    Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a

    Feb 1, 2020

  • ISEE
    Saudi Arabia Transition to Mining – Blast Optimization at Maaden Gold Mines

    By Angel Rafael Fernandez, Yahya Khader Al-Harbi, Benjamin Cebrian Romo, Antonio Morato Medina

    The kingdom of Saudi Arabia has set the goal to diversify their economy from oil into different fields including mining. As the vast Arabian Peninsula is explored, orebodies of Aluminium, Copper, Gold

    Feb 6, 2023

  • ISEE
    Mine To Mill Process Integration And Optimisation – Benefits And Challenges

    By Walter Valery, Sarma Kanchibotla

    Due to the global financial crisis, the world economy has turned upside down and most major economies in the world are facing severe recession for the past one and half year. During this period most c

    Jan 1, 2010