Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    What a Gas: Blasting Under Pressure

    By Jerry Wallace

    This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (1 l- 14 million cubic meter

    Jan 1, 1996

  • ISEE
    Quarry Blasting Management in Urban and Suburban Environment

    By Alain Blanchier, Gilles Gomez

    Neighborhood pressure on quarries has become urgent to deal with quarry managers and operators must apply the most recent technologies and communicate it for long shelf life time exploitation, the qua

    Jan 1, 2009

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • ISEE
    Rock Fragmentation by Explosives: Myths and Realities

    By Wilfrid Comeau

    While researching for a theme lecture (Comeau, 1993l) on: 'The Mechanics and Physics Explosives', the author of Energy Transfer in Rock Fragmentaion by was confronted with many conflicting concepts re

    Jan 1, 1995

  • ISEE
    Utilizing Continuous Photo Analysis of Fragmentation as a Blast / Crush Improvement Tool

    By James McGough, Lawrence Mirabelli, Ran Tamir

    The paper will demonstrate how automated fragmentation photo analysis is being used at the Lafarge North America, Ravena NY quarry as part of an ongoing drill, blast and primary crushing continuous im

    Jan 1, 2012

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • ISEE
    Explosive Operations and its Regulation in the Gulf of Mexico

    By D. J. Leidel

    The offshore production of oil and gas resources has been active in the Gulf of Mexico since Kerr- McGee drilled the first commercial well out of the sight of land in 1947. Since then, approximately 6

    Jan 1, 2002

  • ISEE
    Impact of Open-Pit Blasting on the Multi-Seam Workings of Adjoining Underground Coal Mine

    By Ajoy K. Singh, B Mohanty, P K. Singh

    A study was conducted to investigate the damage potential to underground multiseam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal exp

    Jan 1, 2011

  • ISEE
    Using Explosive Risk Assessment Tools for Emergency Operations Planning

    By Dean Nichols, Matt Ortel

    Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly

    Jan 1, 2016

  • ISEE
    Journal: A Case Study of Full-Face Blasting in a Highway Tunnel in Korea

    By Hae-Moon Choi, Sang-Don Lee, Chang-Ha Ryu

    The purpose of the study presented in this article is to establish a standard blast pattern to yield optimum blasting performance along with an attempt to reduce a difference between design and constr

    Jan 1, 2006

  • ISEE
    Strategic Public Relations for Underground Conservatory at Tennessee Governor’s Residence

    By Jake Hutchison, Wade Hutchison

    The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro

    Jan 1, 2009

  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • ISEE
    Developments of Granular Emulsion Explosives

    By Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki

    Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A

    Jan 1, 2005

  • ISEE
    Underwater Explosions Part 4. Signal Damping

    By M. Hagfors

    On the underwater testing of explosives, the measuring system consists of water filled test pond, tourmaline based pressure sensor, measuring cable and measuring unit, which supplies the DC current to

    Jan 1, 2006

  • ISEE
    Structural Response of Brick Veneer Houses to Blast Vibration

    By Adrian Moore, John Wilson, Alan Richards, Emad Gad

    Project C9040 – ‘Structure Response to Blast Vibration’, funded by the Australian Coal Association Research Program (ACARP), involved the investigation of the structural response from blast vibration

    Jan 1, 2003

  • ISEE
    Blasting in Antarctica

    By Charlie Brumbaugh

    Antarctica with its diverse conditions such as severe cold, high winds, rock and ice structure and limited explosives available posed many obstacles. This paper will give an overall view of the method

    Jan 1, 2000

  • ISEE
    Optimizing Non-ideal Blasting for Ideal Grinding

    By Jack Eloranta

    The winning of metals often requires fine grinding of very hard ore. The US Bureau of mines measured compressive strengths exceeding 100,000 PSI (700 MPa) in Minnesota taconites. Grinding down to 300

    Jan 1, 2013

  • ISEE
    Blasting 1 Million Tons, 205 Meters from a Town

    By Thierry Bernard, Guy Gagnon

    Blasting at very close proximity to urban areas is typically a situation where both local communities and mining stakeholders get nervous. The context becomes logically even more tensed when the blast

    Jan 1, 2014

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Journal: History of ISEE – Timeline / 35 Years

    1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.

    Jan 1, 2010