Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis
By M. A. El-Sohby
The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin
Jan 1, 2010
-
Oakland Airport Roadway Project - Synopsis
By David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods
By Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Practical Soil Nail Wall Design And Constructability Issues
By Walter G. Kutschke
Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us
Jan 1, 2007
-
Analytical and Field Estimates of Shaft Resistance in Socketed Piles: Bandra-Worli Sea Link, Mumbai
By Sunil S. Basarkar, Dilip M. Dewaikar, Rajesh H. Gajjar
"A load transfer program AXPILE was developed for simulation of the loadmovement characteristics of socketed piles of the Mumbai reg ion. This program used empirical relationships for ultimate shaft r
Jan 1, 2005
-
Micropiles To Support Electric Power Transmission Towers
By Wendy L. Mathieson
The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta
Jan 1, 2004
-
Interpreted Residual Load In An Augered Cast-In-Place Pile
By Timothy C. Siegel
Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi
Jan 1, 2009
-
High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place Piles
By Garland E. Likins
High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec
Jan 1, 1995
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - Summary
By Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
DFI Collaborates on Risk-Based Panels
By Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)
By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Structure Support on Laterally Swept Piles
By Morgan L. Race, Matthew R. Glisson
"Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval
Jan 1, 2017
-
Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.
By Peter O. Wilkinson
Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a
Jan 1, 2006
-
Soil Mixing - Title ? Table Of Contents
Jan 1, 2001
-
Reducing Downdrag Loads With Bitumen
By J. -L. Briaud
This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the
Jan 1, 1991
-
Fundamental Tests On The Performance Of High Capacity Pin PilesSM
By Donald A. Bruce
Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho
Jan 1, 1993
-
What Causes Piles To Penetrate - Introduction
By George G. Goble
In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en
Jan 1, 1995
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary
By John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997