    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
  • DFI
    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart Cells

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th

  • DFI
  • DFI
  • DFI
    Dynamic Load Testing of Drilled Deep Foundations

    By Paikowsky, Samuel G.

    "Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically

    Jan 1, 2015

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    Behavior Of Excavation And Pile Foundations In Soft Bankok Clay

    By D. T. Bergado

    The uppermost subsoil profiles of the Bangkok plain can be divided into four layers, namely: weathered clay, soft clay, stiff clay, and dense sand layers. The soft Bangkok clay is a normally consolida

    Jan 1, 2010

  • DFI
    Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26

    By E. C. Demsky

    This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret

    Jan 1, 1989

  • DFI
    The Evolution of Augered Cast-in-Place Piles

    By Willie M. NeSmith, W. Morgan NeSmith, Alan Roach

    "In 2013, Augered Cast-in-Place (ACIP) piles are a mature foundation technology throughout the United States. General guidelines for the design and construction of ACIP piles are available along with

    Jan 1, 2013

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
  • DFI
    Impact And Ramifications Of Setup For Pile Foundations

    By Cory G. Rice

    A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the

    Jan 1, 1992