Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Retreating Cu-Mo Rougher Tailing by Flotation for Concentration of Copper and Molybdenum

    Retreating Cu-Mo Rougher Tailing by Flotation for Concentration of Copper and Molybdenum

    Sep 13, 2010

  • AUSIMM
    A Dilution-based Stability Graph for Open Stope Design

    By F T. Suorineni, L Baird, A Papaioanou, D Hines

    The Mathews et al (1981) stability graph was developed to provide guidance in the determination of stope sizes to control dilution in bulk mining of large orebodies. Longhole and sublevel open stoping

    May 9, 2016

  • AUSIMM
    Zero Base Design and Risk Mitigation

    This paper examines the integration of risk management into the design philosophy of a project to produce a æzero baseÆ design, which targets a minimum capital cost without adversely impacting upon th

    Jan 1, 2004

  • AUSIMM
    The Use of Major Ion Analysis and Stable Isotopes dO18 and dH2 to Distinguish Groundwater Flow in Karijini National Park, Western Australia

    By W Dodson, S Dogramaci

    Isotopes and hydrochemistry were used to define groundwater flow systems and better understand the hydrogeological setting of the Karijini National Park, which is in the Central Pilbara region adjacen

    Jan 1, 2009

  • AUSIMM
    Recent Developments in Stress Analysis and Live Reclaim Prediction within Iron Ore Stockpiles

    By K C. Williams, A W. Roberts, J D. Prigge

    For stockpile design, the flowability and structural interfaces are critically dependant on the stress conditions throughout the pile. Historically, the predictive methodologies for stress determinati

    Aug 12, 2013

  • AUSIMM
    Grinding ù The Primary Conditioner

    By P Steinier

    Most operations, when considering their comminution circuit, are primarily concerned with achieving the desired particle size distribution to obtain adequate liberation for the separation process, at

    Jan 1, 2004

  • AUSIMM
    Kiruna-type Iron Deposits in the Mesozoic Ningwu Volcanic Basin, Eastern China – Origin and Relationship to Subvolcanic Dioritic Intrusions

    By X-F Zhao, J-W Li, L-P Zeng

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of Kiruna-type deposits has been ascribed to either immiscible iron phosphate

    Mar 18, 2015

  • AUSIMM
    Comparative Studies on Balls Versus Spheroidal Tetrahedrons Working Media to Ore Grinding in an Industrial Drum Mill

    Comparative Studies on Balls Versus Spheroidal Tetrahedrons Working Media to Ore Grinding in an Industrial Drum Mill

    Sep 13, 2010

  • AUSIMM
    Evolution of Semi-Autogenous Grinding Mill Control at Century Zinc

    By A Prinsloo, R Tewu

    Automatic control of semi-autogenous grinding (SAG) mills has often been considered complex. Recent experiences at Century Zinc (worldÆs second largest open pit zinc mine) refute this. Together with o

    Jan 1, 2009

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • AUSIMM
    Development of Environmental Management Systems in the Mining Industry

    Various influences determine how an Environmental Management System (EMS) for a mining or petroleum project is developed and administered. These influences include the environmental and resource legis

    Jan 1, 1995

  • AUSIMM
    A review of the strategy and gas monitoring results obtained during the use of Queensland Mines Rescue Service GAG unit at Crinum North mine

    By E Westthorp

    Final mine sealing of BMA’s Crinum North mine, near Emerald, Queensland was undertaken in December 2015. Due to the benign atmospheric environment at Crinum North, the Queensland Mines Rescue Service

    Aug 28, 2017

  • AUSIMM
    Improved Copper Flash Smelting at Olympic Dam

    By W Taylor, S Chen, R Haywood, M White, R West, J Ranasinghe

    In March 2012 a combined BHP Billiton and Hatch team embarked on a program to improve the concentrate burner efficiency of BHP Billiton’s Olympic Dam copper flash smelting furnace. A multi-faceted app

    Sep 7, 2015

  • AUSIMM
    The Research on Refined Gold Bullions Surface Upgrading

    The Research on Refined Gold Bullions Surface Upgrading

    Sep 13, 2010

  • AUSIMM
    Incorporating research data in addressing methane and coal dust fire, and explosion hazards in coalmines

    By S Kundu, J Zanganeh, D Eschebach, B Moghtaderi

    The concentrations of methane and coal dust vary from one location to another in underground coalmines. In the presence of an ignition source, such as static electricity, these mixtures can initiate e

    Aug 28, 2017

  • AUSIMM
    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values

    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values Electronic waste (e-waste), which is a hazardous waste, can indeed be a good source of metal values especially for

    Sep 13, 2010

  • AUSIMM
    A New Approach to Stope Scale Orebody Mapping

    By I Mason, A Wellington, J Hargreaves

    Many people are familiar with the use of marine echo sounders which are used by fishermen to monitor water depth and locate schools of fish. Similar technology has recently been used in some West Aust

    Jan 1, 2000

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • AUSIMM
    Hybrid Process Control Strategy for the Ok Tedi Mining Ltd Semi-Autogenous Grinding Mill #2 - A Comparative Analysis

    By G Metzner, R Rodriguez, C Savage

    OK Tedi Mining Ltd. (OTML) is in the process of optimising the concentrator performance. One aspect that has been recently implemented is an upgrade of the existing expert control philosophy on the gr

    Jul 15, 2013