Search Documents

  • IMPC
    Using DEM to Model Ore Breakage within a Pilot Scale Sag Mill

    By Rob D. Morrision, Paul W. Cleary

    "The best accepted method for design of autogenous and semi-autogenous mills is to carry out pilot scale test work using a 1.8 m diameter by 0.6 m long pilot scale test mill. The load in such a mill t

    Jan 1, 2003

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand

    Platinum-group minerals (PGM) are recorded from a number of localities along theWaiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts of

    Jan 1, 1995

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    Seismic Response to Mining at the Brunswick No.12 Mine

    By Brad Simser

    The Brunswick No. 12 Mine is a 10 000 tonne per day producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stopin

    May 1, 2003

  • CIM
    Potash Processing: 25 Years of Process Development

    By A. F. Banks

    "Potash processing in Canada commenced on a commercial scale in 1962. Over the last 25 years it has grown into a world-class industry with many advances in processing technology. As it is a relatively

    Jan 1, 1987

  • AUSIMM
    Analysis and Modelling of the Fragmentation Process – Case Studies at El Teniente Mine

    By V Barrera, A Brzovic, M Gaete, L Burgos, E Arancibia

    Fragmentation is one of the most relevant parameters in the design and operation of a mine using the caving mining method. Fragmentation affects all subsequent operations, including extraction, commin

    May 9, 2016

  • AUSIMM
    The Peak Hill High Sulphidation Gold Deposit, NSW

    By G J. Corbett, T M. Leach

    Although hosted within an Ordovician magmatic arc, the Peak Hill high sulphidation system displays features typical of youngerPacific Rim high sulphidation epithermal gold deposits. Regional NW trendi

    Jan 1, 1995

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • SME
    The application of an improved multi-scale computational modelling techniques to predict fugitive dust dispersion and deposition within and from surface mining operations

    The extraction and processing of minerals from surface mines and quarries can produce significant fugitive emissions as a result of site activities such as blasting, unpaved road haulage, loading, pri

    Jan 1, 2009

  • AUSIMM
    Effectively linking mining geology with waste management – a case study from western Tasmania

    By A Parbhakar-Fox, B G. Lottermoser

    Management of solid mine wastes, particularly waste rock, requires careful planning to reduce the likelihood of sulfide oxidation, and generation of acid rock drainage (ARD). Waste management strategi

    Sep 20, 2017

  • DFI
    Static And Dynamic Approaches For Bearing Capacity Evaluation Of Driven Piles In Two Dry Docks Project

    By N. Shariatmadari

    Two dry docks are currently under construction on the northern banks of the Persian Gulf by Iran Shipyard and Offshore Industries Co. (ISOICO). The construction of these dry docks forms a huge civil o

    Jan 1, 2007

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • NIOSH
    OFR-72-73 Analysis Of Communication Systems In Coal Mines

    By M. D. Aldridge

    The results of a two-year research effort aimed at improving communication systems in coal mines is reported. A review of communication methods presently used in coal mines is presented. Theoretical a

    Jan 1, 1973

  • CIM
    EKATI Safety Guarantee A Conversation for an Extraordinary Possibility

    By Richard Morland

    Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm

    May 1, 2010

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • AUSIMM
    Environmental effects of open cast coal mining and the in-situ processes of natural remediation: Wangaloa open cast mine, South Otago, New Zealand

    By D Craw

    Sulphur-rich minerals such as authigenic pyrite (FeS2) are commonly associated with coal mine workings. Metallic elements such as arsenic (As), copper (Cu) and zinc (Zn) are enriched in the pyrite rel

    Jan 1, 1999

  • SME
    Impact Of Nitrogen Inertization On Methane Distribution In Bleederless Longwall Gobs

    By J. Marts

    Underground longwall coal mining sections are operated as sealed gobs if the coal is prone to spontaneous combustion. Sealing along the gate roads during longwall face retreat limits the flow of fresh

    Feb 27, 2013

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Discounted cash flow analysis — Methodology and discount rates

    By L. D. Smith

    "This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of

    Jan 1, 2002