    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • ISEE
    Saving Time and Money with Mobile Reporting and Online Databases

    By Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall

    As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori

    Jan 1, 2018

  • SME
    Experimental research on the behavior of ventilation air around shafts during a fire

    The safety of personnel is the most important matter during a mine fire. However, there is not enough research on a case when a fire occurs near a shaft and the behavior of the fire gas is not well un

    Jan 1, 2009

  • ISEE
    Computer-Aided Design & High-Precision Systems in Drilling & Blasting

    By William Wilkinson, Vladisla Kecojevic

    Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona

    Jan 1, 2004

  • CIM
    Supercharge Your Ore Testing and Characterisation with the JKRBT

    By Peter Rubie, Toni Kojovic, Fengnian Shi

    "Mining companies have recognized that characterization of ore breakage plays an essential role in the design and optimization of comminution circuits.Recently the Julius Kruttschnitt Mineral Research

    Jan 1, 2009

  • CIM
    Operation of La Mine Doyon

    "At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.

    Jan 1, 1984

  • AUSIMM
    Experimental Studies in the System PbS-FeS-ZnS-(Ag2S) at 1 Atmosphere to 27 Kilobars: Implications for the Broken Hill Orebody

    Experimental petrology may be used to accurately constrain PTX conditions in order to calibrate and understand geologic processes. This method may be used to answer postulated questions, by recreating

    Jan 1, 1998

  • SME
    Derivation Of Mineral Processing Environmental Sustainability Indicators Using A DEA Weight-Restricted Algorithm

    By I. Tsolas

    This paper presents the use of non-parametric approach (i.e., data envelopment analysis, DEA) for the development of environmental sustainability indicators in mineral processing using environmental,

    Jan 1, 2008

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • AUSIMM
    Validation of a modified cross-belt sampler for reconciliation purposes

    By E A. Amaral Jr, A C. Chieregati, J C. O Souza

    Cross-belt samplers are designed to sample particulate material in processing plants, usually when there is no space to install a conventional linear falling stream sampler. Most of the available cros

    May 9, 2017

  • ISEE
    Development of a Wireless Sensor Network for Blast Monitoring and Slope Stability

    By Johnny Lyons-Baral, John Kemeny, Don Kraemer

    Ground vibrations from blasting can result in the degradation and failure of rock and soil exposures, as well as damaging neighboring houses and buildings. At the same time, vibration provides an oppo

    Jan 1, 2014

  • SAIMM
    Mechanical Behaviour of Surrounding Rock Mass and New Lining Structure of Air-tight Pressure Cavern

    By M .. Hori, H. Onishi, Y. Goda

    The split-lining structure was newly developed for the air-tight lining of the underground compressed air storage cavern. This structure consists of separated reinforced concrete (RC) segments and air

    Jan 1, 2003

  • IIMP
    Voladuras masivas mejorando fragmentacion y estabilidad de paredes finales

    By Martín E. Mendoza

    En 2010 se identificó un peligro potencial en la pared Norte del Tajo Chaquicocha, donde existía fallas pre-existentes, catch bench reducidos (subestándar) y bloques colgados que presuponían condicion

    Sep 12, 2011

  • SAIMM
    Measurement Systems For Gravity Circuit Performance: A New Approach.

    By R L. Langak, R A. Heins

    The use of differences in specific gravity between minerals to separate them has long been utilized in the extractive industries. The environmental and cost benefits of the commercialized forms of the

    Jan 1, 2006

  • SAIMM
    Low-Silicon Ferrosilicon Production From Iron Ore Materials In An Oxygen Reactor

    By A. V. Pavlov, V. A. Grygorian, Kossyrev, A. E. Semin, A. Korostylev

    A new way of producing low-silicon ferrosilicon from iron-ore materials in a new type of aggregate-oxygen reactor is presented. The oxygen reactor process is based on using the calorific combustibilit

    Jan 1, 2004

  • NIOSH
    IC 7587 The Evaluation of Converters for Exothermic and Endothermic Catalytic Reactions Occurring Within Narrow Temperature Limits

    By Gustav Wirth

    "ABSTRACTIn exothermic and endothermic catalytic reactions, control of the temperature is of utmost importance. Basic calculations are developed for determining catalyst volumes of various types of re

    Nov 1, 1950

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007

  • CIM
    Process Improvements at Placer Dome Campbell Mine

    By K. Norris

    "The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p

    Jan 1, 1992

  • AUSIMM
    Generation and Attachment of Submicron Size Bubbles to Colloidal Solids

    Generation and Attachment of Submicron Size Bubbles to Colloidal Solids

    Sep 13, 2010

  • SME
    The North American Tunnel Method—Lessons Learned

    By Don Phelps, John Hawley, David P. Field

    In recent years observational techniques of tunneling have become increasingly popular methods to facilitate complex underground infrastructure projects. The traditional design and construction manage

    Jan 1, 2005