Search Documents

  • DFI
    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise

    Jan 1, 2014

  • SAIMM
    Electric Arc On A Coke Bed In A Submerged Arc Furnace

    By J. A. Bakken, T. Magnusson, G. Sævarsdottir

    This paper describes measurements of current and voltage done on submerged arc furnaces. The aim is to focus on and attempt to separate from one another the electric arc current and the current bypass

    Jan 1, 2007

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • NIOSH
    The Mineral Industry Of Other Near East Countries - Afghanistan (f2e5e637-4b76-456f-a3b8-ed1b609ad5d1)

    By Peter J. Clarke

    The Soviet-controlled Government in Afghanistan continued to emphasize development of the country's mineral resources, primarily to supply raw materials and fuel to industrial areas in the Soviet

    Jan 1, 1985

  • SME
    The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario Operations

    By T. Weatherwax

    As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects

    Jan 1, 2008

  • AUSIMM
    Treatment of Smelter Fume at the Electronic Refining and Smelting Company (ER&S), Port Kembla

    The ER&S Company operates a copper sinter plant, blast furnace and converter smelting complex at Port Kembla. Eighty percent of the smelter feed is dirty copper concentrates that contain some lead

    Jan 1, 1984

  • SME
    Utilization of lignite fly ash as hydraulic binder and backfill material

    By I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács

    This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi

    Jan 1, 2011

  • SAIMM
    Characterization and Flocculation Studies of Fine Coal Tailings

    The re-use of waste water from coal preparation plant tailings is always desirable, but is generally problematic in terms of solid-liquid separation. Dewatering and disposal of coal slurry at a high p

    Jan 1, 2014

  • SME
    Fluorspar – trends and changes in production and use

    By Lawrence Pelham

    Introduction Fluorspar demand or consumption has been taken for granted in recent years, except for those that produce, market, or consume the commodity. Thinking used to be that as the steel and alu

    Jan 11, 1986

  • NIOSH
    OFR-46-75 Electromagnetic Noise In Lucky Friday Mine

    By W. W. Scott

    Measurements of the absolute value of electromagnetic noise and attenuation along a hoist rope were made in an operating hard-rock mine, Lucky Friday Mine, located near Wallace, Idaho. Spectra of elec

    Jan 1, 1974

  • SAIMM
    Multivariate Block Simulations of a Lateritic Nickel Deposit and Post-Processing of a Representative Subset

    By J. Daraisme

    Société le Nickel (SLN) exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, and t

    Jan 1, 2014

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • AIME
  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • IOM3
    Three-dimensional modelling of fill drainage in mine stopes

    By L. T. Isaacs, W. H. Traves

    A numerical model for analysing the drainage of fill in mine stopes has been described. The model can be used to analyse the process of fill drainage in existing and proposed mine stopes. The validity

    May 1, 1991

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • CIM
    A Review of Iron Oxide Copper-Gold Deposits, with Focus on the Wernecke Breccias, Yukon, Canada, as an Example of a Non-Magmatic End Member and Implications for IOCG Genesis and Classification

    By D. J. Thorkelson

    New data indicate Wernecke Breccia-associated iron oxide copper-gold (IOCG) deposits likely formed from moderate-temperature, high-salinity, non-magmatic brines. The breccias formed in an area underla

    Jan 1, 2007

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • SME-ICGCM
    Surface Subsidence. in Longwall Mining--A Case Stud

    By R. D. Yancich

    A case study of longwall mining surface subsidence was performed at a mine in Southwestern Pennsylvania. The mine operated in the Pittsburgh coal seam which averaged 70-72 inches with 6-8 inches draw

    Jan 1, 1984

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017