Search Documents

  • SME
    Alberta Lake Re-Established After Draining to Mine Coal

    By Sukru Sumer

    East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west

    Jan 1, 1995

  • CIM
    Reprocessing of a French Guyana Operation Tailings Using Flotation for Gold Concentration

    By P. Botane, A. Cailleau

    "Compagnie Miniere Esperance operates a gold primary ore body. The ore is processed through crushing, grinding and gravity concentration generating tailings with remaining fine gold. Analyses of the t

    Jan 1, 2009

  • DFI
    Wanapum Dam Repaired Using Post-Tensioning Anchors

    By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein

    In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o

    Jan 1, 2018

  • SAIMM
    Continuous improvement management for mining companies

    By M. Mikolás, L. Pomothy, K. Špakovská, M. Vanek

    "Enterprises are faced with increasing economic competition and managers are obliged to look for methods that will ensure a competitive edge in their companies’ markets. These methods include manageri

    Jan 1, 2015

  • CIM
    The Origins of Pressure Hydrometallurgy

    By F. Habashi

    The pioneer work on pressure hydrometallurgy was conducted in Russia at the end of the nineteenth, and the beginning of the twentieth centuries, by Karl Josef Bayer (1847-1904) and Vladimir Nikolyevit

    Jan 1, 2004

  • SME
    Sustainability and resource efficiency in potash and rock salt mining

    By F. X. Spachtholz

    "Raw materials industry is crucial for national economy. German mining companies are known for their high degree of resource efficiency based on modern technology and know how. K+S is one of the world

    Jan 1, 2011

  • AUSIMM
    Deep Leaching and Accelerated Post-Mine Oxidation in the 500 Orebody at Mount Isa

    Structurally- controlled deep leaching processes have removed vast quantities of carbonate from a substantial portion of the "silica-dolomite" enclosing the 500 copper orebody. Mine drainage

    Jan 1, 1968

  • AUSIMM
    Pressure Leaching of a Manganese Ore Part I: Kinetic Aspects

    By Woodcock J. T

    When an aqueous suspension of pyrite and manganese ore reacts with oxygen, manganese is dissolved by the ferrous sulphate and sulphuric acid produced by the oxidation of pyrite. The kinetics of certai

    Jan 1, 1958

  • AIME
    Reservoir Engineering – Laboratory Research - Laboratory Study of a Combination of Forward Combustion and Waterflooding – The COFCAW Process

    By D. R. Parrish, F. F. Craig

    In some respects, forward combustion (alias: fie-flooding, underground combustion, in-situ combustion, dry combustion) is an efficient oil recovery method. For example, its displacement efficiency (as

    Jan 1, 1970

  • AUSIMM
    Cenosphere Formation during the Combustion of Pyrite

    Magnetite cenospheres 40-270 I/m in diameter have been found during the combustion of pyrite concentrate.Micrographs of the surface and internal structures are presented together with comment on the m

    Jan 1, 1980

  • CIM
    Sintering optimization of manganese ore fines: A mixed multilinear regression and linear programming model

    By M. F. Almeida

    "Due to the randomness of all factors influencing the sintering operation, a two-stepped procedure is proposed to find the best way of using stocked fines at a plant producing Fe-Mn alloys for the ste

    Jan 1, 1998

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004

  • CIM
    A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process

    The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent

    Jan 1, 1979

  • AUSIMM
    Infrastructure Needs and Costs for Mining Projects

    By Gibbs R

    The objective of this paper is to provide a broad qualitative perspective of the needs and costs of infrastructure associated with typical mining projects. Infrastructure may be defined as anything

    Jan 1, 1990

  • CIM
    Modelling of Blast-Induced Stress Wave Propagation and Fracturing In Hard Rock Material

    By Ali Mortazavi

    In underground mining applications, successful blasting results in less damage, which may lower support costs, lower dilution and produce a uniform fragmentation. The explosive detonation process crea

    May 1, 2002

  • CIM
    Vegetative Studies on Sulphide and Slag Tailings

    By E. M. Watkin

    "Although Canada has achieved one of the highest living standards in the world, people and organizations have, over the past decade, begun to question the cost and means of this achievement. Concern h

    Jan 1, 1975

  • ISEE
    Planning to Demonstrate Why High PPVs Work for Close-In Blasting

    By Chris Breeds, Larry Leone, Jerry Wallace

    Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str

    Jan 1, 2010

  • SME
    Special Report : Consultants Streamline, Sell More When Work is Harder to Find

    By Hans W. Schreiber

    Most geologic and mining engineering consulting firms* began to experience the recession with declining billing levels, number of inquiries, and proposal requests in late 1981 or early 1982. As of tod

    Jan 2, 1983

  • SME
    Recent Developments in the TBM Industry—New and Innovative Technologies

    By Martin Herrenknecht, Karin Bäppler

    The last five years have seen a remarkable increase in tunnelling projects in both soft ground and hard rock applications. Part of the increase is a result of recent Research & Development efforts to

    Jan 1, 2005