    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 Tunnel

    By S. H. Jason Choi

    The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne

  • SME
    Carbon Black Production From Waste Tires

    By B. P. Faulkner, M. Weinecke

    Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches

    Jan 1, 2001

  • SME
    Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project

    By Hendrick A. D. Kirsten, A. Clayr Alexander

    Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so

    Jan 1, 2001

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • IIMP
    Metodología general para la ejecución de piques verticales en terrenos altamente deformados

    By Enrique Castells

    La extracción del mineral es el método más habitual para la explotación minera y se realiza a través de rampas, galerías, y túneles que permitan el acceso hasta la zona de minado. Sin embargo, cuando

    Sep 13, 2001

  • SME
    METSI - Innovative solutions and technologies for management of mining related water in South Africa

    By R. Schwarz, E. Pusch, A. Juch

    "The paper describes in general the objectives, goals as well as theoretical background of "METSI"-project proposal submitted to German BMBF (Federal Ministry of Education and Research). The METSI pro

    Jan 1, 2011

  • NIOSH
    RI 8453 Documentation and Analysis of a Massive Rock Failure at the Bautsch Mine, Galena, III.

    By Jack Touseull

    On November 15, 1972, the Bautsch mine, a lead-zinc mine in Paleozoic dolomites, experienced a massive rock failure involving 3 to 5 million tons. Because this failure was large and extended to the su

    Jan 1, 1980

  • CIM
    Underground Milling of Uranium Ores

    By Chuck Edwards

    "Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling

    Jan 1, 2007

  • SME
    Bauxite Residue Fractionation With Magnetic Separators (97e49229-6f62-4ed3-b3b5-93e2e0e61fbc)

    By D. William Tedder

    Several bauxite residue sands and muds produced by Bayer plants in the U.S. and overseas have been fractionated using dry and wet magnetic separators. The magnetic sand fractions typically contain abo

    Jan 1, 1984

  • SAIMM
    Critical investigation into the problems surrounding pillar holing operations

    By L. Mpolokeng, J. P. Labuschagne, H. Yilmaz

    "An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp

    Jan 1, 2015

  • SME
    Inspection of a Brick-Lined Aqueduct

    By Paul S. Fisk, Arne Fareth, Julie Frietas, Francis Lo, Fidel L. Mallonga

    INTRODUCTION This report describes the inspection of parts of the New Croton Aqueduct (NCA)undertaken for the New York City Department of Environmental Protection (NYCDEP)by Parsons Brinckerhoff Qu

    Jan 1, 2007

  • AUSIMM
    Mining and Ore-Treatment at the Talisman Mine, Karangahake, NZ

    THE Talisman mine is situated on the Waitawheta (pronounced Wytaffetta) river just above its junction with the Chinemuri (pronounced Chinnemurre) river near Karangahake, NZ. The explored reef-bearing

    Jan 1, 1912

  • AUSIMM
    Environmental Procedures and Mining - An Introduction

    In the last two years the Commission for the Environment has received four Environmental Impact Reports (EIR) for Audit and has been or is involved with at least four environmental impact assessments

    Jan 1, 1986

  • AUSIMM
    Leaching of the McArthur River Zinc-Lead Sulphide Concentrate in Aqueous Chloride and Chlorine Systems

    By Gale D. C, Giles D. E, James Parker A

    A zinc-lead-iron sulphide concentrate from McArthur River can be leached at atmospheric pressure in aqueous solutions with HCI, FeCl3, CuCI2, HCl/02 HC1/02/ CuCI2, Cl2, and CI2/CuCI2 to extract >98

    Jan 1, 1976

  • AUSIMM
    A Cyclone Furnace for Slag Fuming

    Laboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti

    Jan 1, 1964

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft Construction

    By C. Vipulanandan

    It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas

  • SAIMM
    LHD optimization at an undergroundchromite mine

    By W. Mbhalati

    "Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat

    Jan 1, 2015

  • DFI
    6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway

    By Aly M. Mohammad

    The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h

    Jan 1, 2002