Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold MinesBy W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
Characterising Ore Micro-Texture Using X-Ray Micro-TomographyBy X. Yuan
"The processing behaviours of ores such as their liberation characteristics in comminution and their response in separation processes are affected by their mineralogical characteristics. Key ore chara
Jan 1, 2012
-
Using Metal-Tolerant Plants to Reclaim Mining WastesBy David R. Morrey
During the past 50 years, significant research has been performed in the ecology and physiology of plants that colonize soils containing elevated concentrations of heavy metals. Similar work has also
Jan 1, 1995
-
Plan compliance process for underground coal mines - SynopsisBy A. A. Angelov
This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the ori
Jan 1, 2010
-
29th Annual Conference 1996 - Field NotesGreymouth River Dredge û Birchfield Minerals Ltd Blackwater Gold Mine û Macraes Mining Company Ltd Globe Progress Gold Mine û Macraes Mining Company Ltd
Jan 1, 1996
-
New York Subway Stations And Crossover Caverns—Update On Initial Support DesignBy Charles Stone, Hannes Lagger, Dru Desai
The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car
Jan 1, 2007
-
Principles of an image-based algorithm for the quantification of dependencies between particle selections in sampling studies - SynopsisBy D. S. Dihalu
A generalization of Gy?s model for the fundamental sampling error introduced the new ?parameter for the dependent selection of particles?, denoted as Cij. This allows for modeling deviations from the
Jan 1, 2010
-
Gold Occurrences at BendigoIN previous discussions on the occurrence of gold in the Bendigo quartz reefs the opinion has been put forward that the gold shoots are primary concentrations in the quartz reefs during the period of
Jan 1, 1922
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining OperationBy Paul Krivokuca
Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??
May 1, 2008
-
Terrace Mining Operations in Stratified DepositsBy A C. Carter
The increasing need for alternative energy sources as well as the less clearly perceived but equally increasing demand for non-fuel minerals has resulted in extensive exploitation of near surface depo
Jan 1, 1980
-
RI 5805 Development Of A 10,000-Ampere Cell For Electrorefining Titanium ? SummaryBy F. P. Haver
The Federal Bureau of Mines developed a 10,000-ampere cell to determine the economic feasibility of producing high-purity electrolytic titanium from mill scrap or offgrade sponge. Operating variables
Jan 1, 1961
-
Australian Rock Bolt Steel Chemistry and Stress Corrosion CrackingIt's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a
Nov 25, 2010
-
Coping with Boulders in Soft Ground TBM TunnelingBy Peter B. Dowden, Robert A. Robinson
Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper
Jan 1, 2001
-
The Carrick Gold Project - An Exploration Case HistoryBy A J. Eggers
With gold first discovered at Carrick in 1864, exploration and mining on the Carrick Goldfield in Central Otago, New Zealand, has now been ongoing for more than 130 years. Recorded historical hard roc
Jan 1, 1997
-
Using the Modern Metric SystemBy John Dasher
In 1980, some US cars were designed and built to metric dimensions; wine and gas were sold by the liter; and the March of Dimes Walkathon was measured in kilometers. Although the US Congress has taken
Jan 2, 1981
-
Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium ProcessBy M. Abdellatif
Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc
Jan 1, 2006
-
Improvements in Coal-Waste Disposal Since Buffalo CreekBy Kelvin K. Wu
A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m
Jan 1, 2006
-
Transition of the Seismograph from a Tool of Litigation to a Tool of Production EfficiencyBy David S. Bowling
The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air
Jan 1, 1990