Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Kinetic And Equilibrium Effects In Gold Ore CyanidationBy M. I. Brittan
Cyanide leaching of two West African gold ores was studied in multiple laboratories to provide process-engineering data for plant design purposes. Unusually slow leach extraction kinetics were observe
Jan 1, 2008
-
Plant Design, Practice Conference Attracts Processing SpecialistsBy William R. Yernberg
The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by
Jan 1, 2003
-
Coal Division - Elements In Coal And Potential Environmental Concerns Arising From These ElementsThe Environmental Session will consist of five papers dealing with various aspects of trace elements associated with coal. Analytical procedures to determine the amounts of trace elements will be disc
Jan 1, 1979
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Heap Leaching Gold-Silver Ores With Poor Percolation CharacteristicsBy S. D. Hill, G. E. McClelland
To maximize productivity and improve minerals processing technology, the U. S. Department of the Interior, Bureau of Mines, is investigating a particle agglomeration technique as a means of increasing
Jan 1, 1981
-
Case Study in Monitoring Mining Induced Subsidence Using Photogrammetry and Conventional SurveysBy Rodger C. Fry
Underground coal mining has been active within the East Mountain property since the mid 1950's. As a result, coal from two seams has been extracted within large areas allowing surface subsidence
Jan 1, 1986
-
Design and Startup of Cortez Gold Mine’s Pipeline MillBy Randy N. Powell
The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas
Jan 1, 1999
-
Lithium ResourcesBy Ihor A. Kunasz
Lithium minerals occur predominantly in pegmatites that contain mineral assemblages derived from the crystallization of post- magmatic fluids or from the metasomatic action of residual peg- matitic fl
Jan 1, 1994
-
Environmental Issues For The Reclamation Of Abandoned Coal Mines In The Appalachian Coal Fields – Preprint 97-179By Anthony B. Szwilski, Dalip Sarin, Richard D. Begley
This paper will present the results of an analysis of several abandoned coal mine projects and includes field data for over a dozen different reclamation projects recently completed in the state of We
Feb 24, 1997
-
The Classification, Evaluation, And Projection Of Coal Mine Roof Rocks In Advance Of Mining (c15b6672-773c-4068-91a1-3646993243f4)By David K. Hylbert
This study investigated roof falls in room-and-pillar drift coal mines in eastern Kentucky and utilized geologic methods for predicting roof conditions in advance of mining. In the Highsplint mine,
Jan 1, 1978
-
Coal Division ? Longwall ? Underground Mining I - Strata Control Simulation During Longwall Mining ? IntroductionBy Christopher Haycocks
Because of growing pressure from government and consumers to produce more coal, the mining industry must improve existing techniques and devise more efficient mining methods. Mining of the thicker, sh
Jan 1, 1979
-
Take Time For Pit Phase DesignBy A. Eccles
Phase designs are the foundation upon which all open pit mine sequence optimizations and budgets should be built. Unfortunately, at times, mine engineers skip the step of developing realistic pit phas
Feb 27, 2013
-
Tunneling for the Chaloem Ratchamongkhon Line in BangkokBy S. Suwansawat, D. J. Maconochie, C. C. Chang
This paper describes the overall delivery of the tunneling for the Mass Rapid Transit Authority of Thailand’s Chaloem Ratchamongkhon Line in Bangkok and the constraints provided by the alignment. Eigh
Jan 1, 2001
-
Sound Transit Link Light Rail Northern ExtensionBy Paul M. Godlewski, Joseph P. Gildner, David S. McAllister
With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill
Jan 1, 2005
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
A Century of Research Leading to Understanding the Scientific Basis of Selective Mineral Flotation and Design of Flotation Collectors Mining, Metallurgy and ExplorationBy Douglas W. Fuerstenau, Pradip Pradip
The design and development of selective flotation collectors has been the key to the remarkable success of flotation in beneficiating complex, difficult-to-process ores. Sustained research efforts in
-
Weathering In Coal Mine Rejects And Tailings - Variation With Respect To DepthBy S. Devasahayam
Acid production or acid drainage is a major environmental issue that also has negative implications on the aquifer system surrounding the mine tailings area. The approach to controlling acid mine drai
Jan 1, 2007
-
Innovative Mining Systems For Low-Cost Production In Very Thick Alluvial DepositsBy G. Goellner
The thick alluvial sand and gravel deposits along the base of the San Gabriel mountain range in Southern California area have been mined for construction aggregates for over 100 years. Encroachment of
Jan 1, 2004
-
Rate Phenomena In Uranium Extraction By AminesBy Charles F. Coleman
Kinetics studies and other rate measurements are reviewed in the amine extraction of uranium and of some other related and associated metal ions. Equilibration' is relatively fast in the uranium
Jan 1, 1979
-
Risk-Management Process for Tailings ControlBy Franco Oboni, Iain G. Bruce
The design of tailings containment structures relies on well-understood engineering methods being applied consistently. Unfortunately, not all facilities are designed or managed to the same level of
Jan 1, 2002