Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
Jan 1, 2013
-
Keynote Lecture 6: Mitsuhiro Shibazaki Jet GroutingBy Mitsuhiro Shibazaki
Generally, water-soluble polymers are effective in convergence of water jet ejected from a nozzle as they add viscosity to water. However, excessive additional polymers (added to keep water viscous) c
Feb 10, 2003
-
Underwater Pile HammersBy Douglas L. Scaggs
Driving piles in under water applications has become more common place over the past twenty years. Where only a water depth reachable with a follower or dewatered cofferdam was the rule in the past,
Jan 1, 2013
-
Assessing the Applicability of Thermal Response Testing to Energy PilesBy C. Guney Olgun, Fleur Loveridge, Tracy Brettmann, William Powrie
"Abstract Deep foundations are increasingly being used, not just to carry structural loads, but also to act as heat exchangers as part of a ground source heat pump system. Such foundations, often call
Jan 1, 2014
-
New I-95 Woodrow Wilson Bridge FoundationsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2009
-
Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - OutlineBy Les R. Chernauskas
? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T
Jan 1, 2001
-
Opimization of Solid and Hollow Micropiles for Shallow Foundations on SandBy P. D. Arumairaj, B. Vani
"Micropiles are small diameter cast insitu reinforced grouted piles and it has been effectively used in many applications of ground improvement. It increases the load carrying capacity of soil and red
Jan 1, 2015
-
Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice ArenaBy John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011
-
Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet PilesBy Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings StructureBy Denis Huber
The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation
Jan 1, 2002
-
Session 14 "Deep Mixing Method III"By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)By Nabil F. Ismael
"Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T
Jan 1, 2017
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Rectification Measures And Restoration Of Distressed Pump FoundationsBy V K. Panwar, Sampat Raj
At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t
Nov 1, 2022
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Session 28 "Modeling and Verification"By Dawn Shuttle
In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh
Feb 10, 2003