                     Lateral Behavior Of Post Grouted Drilled Shafts Lateral Behavior Of Post Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi, Charles Winter The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilled-shaft diameters has motivated the development and increased use of a base grouting (BG) techniqu 
- 
                     The Realities Of Resolving Conflicts During Construction ? Synopsis The Realities Of Resolving Conflicts During Construction ? SynopsisBy J. S. Ward In a well-written set of contract documents, the probability of conflicts arising during the course of construction is minimized. However, no matter how complete may be the technical language in the c Jan 1, 2010 
- 
                     Construction-Induced Vibrations And Green Concrete: Literature Review And Case History Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s Jan 1, 2010 
- 
                     Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - SynopsisBy Uwe Hess For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th Jan 1, 1996 
- 
                     Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project Jan 1, 2006 
- 
                     Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch BridgeBy William Auyeung Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in Jan 1, 2004 
- 
                     Performance Requirements For Vibrocompaction On Crushable Calcareous Sands Of The Uae And Their Verification In Comparison To Silica/Quartz Sands Performance Requirements For Vibrocompaction On Crushable Calcareous Sands Of The Uae And Their Verification In Comparison To Silica/Quartz SandsBy Vijaya Bhushan Rao, Jason Redgers The typical Vibrocompaction projects undertaken in the UAE are on reclaimed Sands. These Sands which are predominantly the crushable, calcareous, carbonate sands found locally as opposed to the more c Oct 1, 2022 
- 
                     Analysis Of Vibratory Driven Pile ? Introduction Analysis Of Vibratory Driven Pile ? IntroductionBy Sherrill Gardner Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type Jan 1, 1987 
- 
                     Performance Of Bituminous Coats In Reducing Negative Skin Friction Performance Of Bituminous Coats In Reducing Negative Skin FrictionBy Makarand G. Khare Though the phenomenon of dragload is known for many decades, there is a lack of clear guidelines to evaluate the amount of dragload. The development of dragload depends on relative movement between pi Jan 1, 2006 
- 
                     RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete Piles RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete PilesBy Xuhui Pile foundations are underground projects which are carried out under complicated site conditions, so it is difficult to summarize their characteristic patterns from the everchanging practical pile fo Jan 1, 1991 
- 
                     Design And Load Test Of Micropiles In A Power Plant In Missouri Design And Load Test Of Micropiles In A Power Plant In MissouriBy Bidjan Ghahreman A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde Jan 1, 2009 
- 
                     A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete PileBy K. Viking It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered Jan 1, 2004 
- 
                     Toward A Unified Design Standard For Steel Sheet Piling Toward A Unified Design Standard For Steel Sheet PilingBy Michael J. Garlich Steel sheet piling has a long history of use in a variety of permanent and temporary structures. Current engineering practice uses numerous publications and standards for design guidance. U.S. desig Jan 1, 2008 
- 
                     Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WY Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WYBy Brent Wilkins The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed Jan 1, 2009 
- 
                     Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century ConstructionBy Alan D. Fisher Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen Jan 1, 2013 
- 
                     Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc Jan 1, 2009 
- 
                     Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In Baltimore Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma Jan 1, 2008 
- 
                     New Outfall Bridge Structures At Bonneville Dam - 1. Introduction New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu Jan 1, 2001 
- 
                     Pile Settlement Design Using Continuous Surface Wave Testing And Modulus Degradation Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me 
- 
                     Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2) Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me Jan 1, 2017 