Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    Peñoles Mines - Mexico. Lessons learned on Concentrator’s Commissioning and Expansions

    By Rodolfo Espinosa Gómez

    "Industrias Peñoles, S.A. de C.V. – Mining Division, has initiated in the last ten years, six Mining Operations (Bismark, Tizapa, Ciénega, La Herradura, Rey de Plata, and Francisco I. Madero) and it h

    Jan 1, 2004

  • CIM
    Rock Mechanics Aspects of the Use of Underhand Cut-and-Fill Paste Sill Pillars: Case Studies

    By Paul Hughes

    This paper summarizes current underhand paste backfill mining as applied to Goldcorp Inc?s Red Lake Mine, Newcrest Mining Ltd?s Kencana Mine and the Lanfranchi Nickel Mine as well as ongoing research

    May 1, 2011

  • CIM
    Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Erik Bartsch, Guy Comeau

    "The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade

    Jan 1, 2008

  • CIM
    The safety imperative—transforming the workplace to protect people (06bb12c8-6d2f-4f7c-beb1-5bcbdcf9392b)

    By G. Winkel

    "Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. T

    Jan 1, 2004

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    A Moveable Mineral Processing Miniplant

    By P. Wells, P. Quinn

    "A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such

    Jan 1, 2003

  • CIM
    Improving Indoor Security Surveillance by Fusing Data from BIM, UWB and Video

    By M. Rafiee

    Indoor physical security, as a perpetual and multi-layered phenomenon, is a timeintensive and labor-consuming task. Various technologies have been leveraged to develop automatic access control, intrus

    Aug 1, 2013

  • CIM
    Carbon Dioxide Use for pH Control at Greens Creek Mill

    By Tim Martin, Dave Tahija

    "In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p

    Jan 1, 2016

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003