Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Cable Bolt Bearing Capacity – An In Situ Parametric Study

    By K. Soucek, J. Ptácek, A. Hastíková, R. Kukutsch, P. Konícek, P. Waclawik

    "Cable bolts are used frequently as a secondary support system (with steel arch support) in difficult stress-strain conditions of deep coal mines. The load transfer mechanism of cable bolts depends on

    Jan 1, 2015

  • CIM
    A Factorial Study of the Effects of Polytetrafluoroethylene Addition, Pulp Density and Oxygen Pressure on the Performance of Pressure Oxidation of Chalcopyrite under Conditions Similar to Those of the CESL Process

    By L. Fernandes

    A two level factorial study was undertaken to investigate the relative impacts of factors affecting the kinetics of polytetrafluoroethylene, PTFE, assisted pressure oxidation of chalcopyrite. A copper

    Jan 1, 2014

  • CIM
    The Unitrain Loadout System

    By D. L. Babbitt, Sniezek

    "This paper deals with the varions methods for the rapid Joading of unit trains which are being: used by ore procossors to move their product to dock-s1de storage facilities or their ultimate customer

    Jan 1, 1969

  • CIM
    A dynamic CIP simulation using Matlab Simulink

    By J. W. Coetzee, H. E. Deist

    Carbon-in-pulp (CIP) and Carbon-in-leach (CIL) processes are used extensively in the gold mining sector to recover aurocyanide from solution. This paper discusses the modelling of these operations, us

    Jan 1, 2005

  • CIM
    The Mineral Industry and Urbanization

    "Since World War II, urban communities have expanded at an unprecedented rate. The industrial mineral industry supplies the sand, grave], limestone, crushed rock, cement, gyp-sum, etc. for urbanizatio

    Jan 1, 1968

  • CIM
    The Manufacture of Silica Brick (0a1af218-3b0d-414e-a6bb-404d1bfed003)

    By H. B. Gillis

    THE following pages c9ntain a brief description of the processes involved in the manufacture of silica brick at the Sydney plant of the Dominion Steel & Coal Corporation. Silica brick manufacture wa

    Jan 1, 1938

  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    Evcc ?cro

    By CRO CRO

    Elk Valley Coal?s Cheviot Project is located in the Alberta foothills south of the town of Hinton. The mine has been in operation now for the 3 years. The start up and subsequent operation of the Ch

    May 1, 2007

  • CIM
    Thermal Fatigue in Rocks- La Roque-Gageac' Case Study

    By D. Virely, M. Gasc-Barbier, J. Guittard

    "The valleys of the Dordogne and the Vézère (France) have been inhabited since prehistoric times, as evidenced by the famous site of Lascaux. A few miles away, the village of La Roque-Gageac is also a

    Jan 1, 2015

  • CIM
    General Geological Features of the Mining Fields of Manitoba and Adjoining Districts

    By J. F. Wright

    Introduction Previous to 1924 the mining fields of Manitoba and adjoining territory had not been prospected in detail, and the reports of the exploration of the mineral discoveries to that date had b

    Jan 1, 1935

  • CIM
    SAG and Ball Mill Circuit Layout and Design

    By L. Dufourm

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Control of Recrystallization in Cold-Rolled AlMn(Mg)ScZr Sheet for Brazing Applications

    By M. F. Gallerneault, V. Fallah, A. Howells, W. M. T. Gallerneault

    "The occurrence of recrystallization in cold-worked aluminum sheet during the brazing process leads to loss of strength, an inhomogeneous grain structure and reduced corrosion resistance. AlMgScZr all

    Jan 1, 2018

  • CIM
    Past And Future Cycles Of Copper: Regional And Global

    By M. D. Gerst

    The degree to which copper will continue to be in an integral part of the world economy in the future will depend largely on the dynamics of global economic development, the primary and secondary copp

    Jan 1, 2007

  • CIM
    Potash Ore Flotation Mechanism: Amine Molecules Adsorption or Amine Particles Attachment?

    By E. Burdukova

    Long-chain primary amines are utilized as collectors in potash ore flotation. Krafft temperature of long-chain amines in brine is about 100 °C, and this makes such amines practically insoluble in brin

    Jan 1, 2009

  • CIM
    Estimation of Stresses and Properties of Coal–Rock Mass Based on Inverse Problem Solution

    By L. A. Nazarova, M. Vandamme, L. A. Nazarov, R. I. Rodin

    "The paper describes a new method of interpreting the “canister test” data for the quantitative estimation of gas-kinetic parameters of coal bed based on the developed model of gas emission from coal

    Jan 1, 2015

  • CIM
    Discrete Modeling of Rock Fracturing for Various Modes and Mechanical Properties

    By J. Duriez, L. Scholtès, F. V. Donzé

    "Fracture propagation process in brittle rock is investigated by means of numerical simulations performed with an adapted formulation of the discrete element method. The progressive failure mechanism

    Jan 1, 2015

  • CIM
    Extrusion of Az-Series Magnesium Alloys

    By D. Letzig

    Wrought magnesium alloys are of special interest as lightweight structural components as a result of their more homogeneous microstructures and improved mechanical properties compared to cast componen

    Jan 1, 2006

  • CIM
    New Approaches for Treatment the Blister Copper at the Codelco Norte Smelter

    By J. Font

    New approaches for the fire refining process of blister copper have been carried out at the Codelco Norte Smelter. These have been mainly focused on modification and improvement of the process configu

    Jan 1, 2007

  • CIM
    Discrete Event Simulation of Mine Equipment Systems Combined with Reliability Analysis Based On Genetic Algorithms

    By Greg Yuriy

    This paper discusses research carried out by the Laurentian University Mining Automation Laboratory (LUMAL) in the field of discrete-event simulation of mine equipment systems and reliability assessme

    May 1, 2003

  • CIM
    Improving Flexibility: Recent Developments at the Horne Smelter

    By H. Perez, A. Lavoie, V. Prévost, P. Létourneau, P. Lind

    The Home smelter is a custom copper smelter located in Rouyn-Noranda, Quebec. In 2005, the smelter produced 145,000 t of copper containing 807,000 oz of gold, 20,388,000 oz of silver in addition to 51

    Jan 1, 2007