Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and Construction of the First Major Diamond Mine in Canada's Northwest TerritoriesNo paper was submitted for the proceedings, verbal presentation only (no material available).
Jan 1, 1998
-
Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport IndonesiaBy E Hernandez, I Agustian, W Kusumohastuti
PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi
Mar 24, 2014
-
Process development for the Mina Justa projectBy I Ritchie, A Johnston, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa copper mine project, located in the Ica region of Peru. The Mina Justa IOCG orebody comprises of a sulfide mass overlain by an oxide cap with a sha
Sep 11, 2017
-
Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional AreaBy A Bagis
Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while
Mar 8, 2011
-
Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surfaceBy B Wu, C Zhao, B Lei
At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur
Oct 12, 2022
-
Understanding the causes of dilution in narrow vein stopesBy S Thomas, S Ricketts, R Hassell
Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d
Mar 15, 2021
-
Hearth Behaviour of Port Kembla Blast FurnacesBy Munive L
As a result of commissioning No.5 B F, 2670m3 inner volume, in March 1972, the largest B F in Australia; new expertise in maintenance, furnace operating practices and design have been obtained. Th
Jan 1, 1981
-
The Chromite Resources of Papua New GuineaDeposits of chromite are in associated with ophiolite complexes in Papua New Guinea. No deposits which are currently exploitable have been recognised, but large resources that may be economic in t
Jan 1, 1987
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Understanding Tailings Geochemistry - Continuous Learning and Innovation When Planning for Mine ClosureBy N Kawashima, R St C Smart, A M. Robertson
This paper focuses on a case study at a base metal mine located in a tropical semi-arid area of Western Australia (WA). It is demonstrated that understanding the geochemical nature of the mine tailing
Jul 10, 2012
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
Transcending the Mining Discipline Divide – Multidisciplinary, Interdisciplinary or Transdisciplinary?By J Coombes
"In today’s challenging climate of reduced staffing, limited funding and uncertain markets, we are called on to operate more productively and ‘be more innovative’. As an industry, we are quick to iden
Mar 8, 2016
-
Application of Simulation Technology to the Design of Coal Clearance SystemsLongwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,
Sep 26, 2011
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
A Phased Approach to Test Programs to Meet Feasibility Study RequirementsBy E Williams
The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re
Oct 5, 2011
-
Australian Innovation in African Heavy-Haul RailBy K Devencorn
The development of robust, economical transport infrastructure has been identified as a key driver to sovereign economic growth. Notwithstanding the value of undeveloped mineral resources, unless they
Nov 22, 2011
-
Development of an acQuire Based Geotechnical Data Management SystemBy V Pere
A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio
Aug 22, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007