Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Characterisation of In Situ Stresses for Tunnel Lining Design in the Sydney?BasinBy A L. de Ambrosis, S J. Clarke
In the non-codified realm of tunnel design there are issues which are sure-fire instigators of controversy. This paper presents a discussion regarding one particular issue which in the authors’ experi
Sep 17, 2014
-
The Resistance of Cyclone Underflow Material to Flow LiquefactionBy J Boshoff, D Reid
It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where
Jul 27, 2015
-
Blast Design Using Measurement While Drilling ParametersBy M Higgins
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio
Jan 1, 2001
-
-
Justifying Slope Design Risks and CostsBy N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Innovative Use of Screw Press Filtration in Tailings Dewatering Plant DesignBy D Nieuwkerk, V J. Absolon
"Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog
Sep 1, 2014
-
Excess pore water pressure induced during tailings run-outBy M A. Llano-Serna, D J. Williams, L Bu
Tailings dam failures continue to occur worldwide at an unacceptable rate, averaging two events annually over the last 100 years. Furthermore, tailings dams continue to grow in size, increasing the po
Jul 23, 2018
-
Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational FurnacesBy A Sadri, S Smith
In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using
Jan 1, 2006
-
Enabling Technologies – The Role of New Communications TechnologiesBy C Fischer
The introduction of digital communications technologies into the underground mining industry, in both coal and hard rock mining, has enabled high bandwidth applications to be applied in the mining ind
Nov 22, 2011
-
Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored ShaftsBy R M. Stephenson
Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi
Mar 24, 2014
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
Advances in In Situ Testing of Ventilation Control Devices for Underground MinesBy M Salu, G J. Kay
"As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id
Jun 1, 2012
-
Characterisation of pore pressure in tailings dams and the implications for designBy D Johns, L Murray
This paper discusses pore pressures in the embankments of tailings dams by comparing real world data with common design assumptions. Assessment of pore pressures has implications on material behaviour
Jul 23, 2018
-
Metallurgical Management Tools for Continuous ImprovementBy R Dunne, W McCallum
Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing
Oct 29, 2012
-
Ore variability and process plant performance – the impacts to revenueBy A Millar, B Wraith
Process plants are characterised by variability of performance over a wide range of time-scales; reflected in fluctuations in metal recovery, concentrate grade, plant throughput and reagent costs. In
Aug 24, 2022
-
SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantificationBy J Ashford, Minniakhmetov
Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir
Mar 22, 2022
-
Mass Blasting for Mine to Mill ù The AT04 Mass Blast, Kanowna Belle Gold MineBy D Kay, M Lovitt
Mass Blasts are generally required at the completion of longhole stoping cycles to maximise the recovery of ore from a specific orebody. During the course of mining, the practice is to leave pillars o
Jan 1, 2002
-
Blasthole Cone Sampling Experiments for Iron Ore Flitch MiningBlasthole cone samples are used for grade control in most of the iron ore mines of the Pilbara of Western Australia. This method of sampling is straightforward when the target sampling interval matche
Mar 1, 2010
-
Indicator kriging saves the day – improving reconciliationBy A Purton, C Taylor, E Conroy
The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties
Mar 22, 2022