Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity SettingBy B P. Wrench, M J. Gowan, P J. Chapman
Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat
Jul 27, 2015
-
Fusion of molten phase R&D into the metallurgical industry to drive circularityBy S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows
The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability
Aug 21, 2024
-
Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, QueenslandBy M Norbert, C Bennett
The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i
Sep 17, 2014
-
Resue Mining with eDev™ Electronic Detonators at Stawell Gold MinesBy C Hamilton
Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete
Mar 21, 2011
-
Latest Experience with Dust Suppression in TunnellingBy Girnau G
The necessity of effective dust suppression measures during excavation work is just as uncontroversial in tunnelling as it is in mining. In many respects, in fact, the applied technology is compara
Jan 1, 1987
-
Feature if the New Lead Refinery at Port PirieA new lead refinery with a. capacity of 230,000 tons per year com-menced operation at*Port'Plsie in October, 1959. This plant' superseded the refinery which had operated from 1933 with the a
Jan 1, 1963
-
Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricadesBy M Revell, B Sainsbury, D Sainsbury
This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c
Nov 29, 2022
-
What category cyclone is devastating your plant?By T G. Vizcarra, B Wong
Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y
Aug 29, 2018
-
The Steelmaker's Contribution to ShipbuildingThe object of this paper is to give an insight into various metallurgical operations involved in the making and shaping of steel for shipbuilding at the Newcastle plants of the Broken Hill Proprietary
Jan 1, 1951
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021
-
Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian ExampleBy A Fitzpatrick
An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa
Jul 10, 2012
-
Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance featuresBy W Malone, J Garrett
FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d
Sep 18, 2023
-
Mt Wright – managing unique risksBy S Long, D Carnovale, L Louwrens
The Mt Wright underground mine (MTW) is located near the town of Ravenswood in north Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited.The Mt Wright
Oct 16, 2017
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western AustraliaBy T Wellman, G Sternadt, R Hingston
The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos
Aug 18, 2014
-
Operational deployment of sensor technologies for bulk ore sorting at Mogalakwena PGE MineBy J Rutter, J du Plessis, er, M Scott, D Alex
It is generally acknowledged that bulk ore sorting is an attractive prospect for the mining industry. However, uncertainties relating to the operational performance of sensor technologies, the grade h
Nov 10, 2020
-
Interactive Modelling and Visualisation of Large Deposits Using Linear OctreesLarge deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod
Sep 26, 2011