Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof

    3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt

    Jan 1, 2001

  • SME-ICGCM
    Comparison Of Multiple And Single Entry Roadways For Highly Stressed Longwalls

    By Klaus Opolony

    The world's most popular method of longwall mining requires multiple entry systems for the panels. In contrast to this mine layout the roadways in German coal mining are used for advanced mining

    Jan 1, 2003

  • SME-ICGCM
    An Analytical Approach to Determine Stress Distribution in Longwall Chain Pillars

    By James M. Kramer

    This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on

    Jan 1, 1998

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Application of Microseismic Monitoring to Longwall Geomechanics and Safety in Australia

    By Xun Luo

    In this paper we report on the use of microseismic monitoring techniques to investigate the fracturing process associated with longwall mining. The study was carried out at three mines in Australia an

    Jan 1, 1998

  • SME-ICGCM
    Mathematical Modeling Of Strong Roof Beds In Longwall Mining

    By Xiaolin Wu

    Most coal bump occurrences in the U.S. are directly related to mining operations under strong roofs. An understanding of the behavior of bridging or cantilevering strong roofs over working longwall fa

    Jan 1, 1993

  • SME-ICGCM
    A Novel Ground Control Program at Plateau Mining Company

    By Hamid Maleki

    A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble

    Jan 1, 1987

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope Entries

    By John Stankus

    Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans

    Jan 1, 2011

  • SME-ICGCM
    Stereological Sampling And Analysis For Characterizing Discontinuous Rock Masses

    By J. K. Owens

    As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I

    Jan 1, 1994

  • SME-ICGCM
    Application Of A Static And Geophysical Monitoring System For Detection Of Stability Problems

    By Maleki. Hamid

    The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur

    Jan 1, 1993

  • SME-ICGCM
    Stability of Backfilled Cross-panel Entries During Longwall Mining

    By Brad Seymour

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine

    By Adrian L. Moodie

    Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.

    Jan 1, 2011

  • SME-ICGCM
    The Application Of Rock Mass Classification Principles To Coal Mine Design In UK Conditions

    By David J. Reddish

    Longwall systems are inflexible in layout, intolerant of disruption and represent a substantial investment. It is therefore essential drat all understanding of the likely strata behaviour and support

    Jan 1, 2000

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Tensioned Cable Bolts As Primary Support: Update

    By John C. Stankus

    At the 19th International Conference on Ground Control in Mining, a paper was presented detailing new types of Jennmar INSTáL tensionable cable bolts (Stankus and Taylor, 2000). Since that time, signi

    Jan 1, 2001

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Design And Application Of Propsetter? In Underground Coal Mines

    By Clifford McCartney

    The PropsetterTM System has been designed and developed to cost effectively solve problems experienced with conventional underground supports used in tailgates, headgates, bleeder entries and as suppl

    Jan 1, 1995