Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development of Low Profile Remote Roof Bolting Module

    By Bill Kyslinger

    In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta

    Jan 1, 2006

  • SME-ICGCM
    German-Chinese Cooperation in the Field of Mining Subsidence Engineering

    By Axel Preusse

    Mining subsidence plays an increasing important role in the Chinese hard coal mining. Reasons for this are a substantial rise of production during the last decade, a dense settlement in many mining

    Jan 1, 2007

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower Seam

    By Vedala Sastry

    Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall

    Jan 1, 2007

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME-ICGCM
    The In-Situ Pillar Strength and Overburden Stability in U.S. Mines

    By Hamid Maleki

    Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall

    Jan 1, 2008

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Historical Perspective And Future Projection Of Longwall Mining In The United States (19eaaffe-326c-46a4-9a81-dc104b2df560)

    By Thomas M. Barczak

    This report chronicles the historical development of longwall mining in the United States and speculates on future developments to the turn of the century. Five eras of technological development durin

    Jan 1, 1992

  • SME-ICGCM
    Insitu Performance of One Step Bolts to New Zealand Thick Coal Seam Mining Environments

    By Richard Campbell

    Effective strata control, utilising fully encapsulated resin grouted roof bolts is dependent on the installed quality of the reinforcement elements. Resin based grouts are the main form of rock bolt

    Jan 1, 2006

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts

    By Hani Mitri

    Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a

    Jan 1, 2012

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    Catastrophic Failures of Underground Evaporite Mines

    By Jeff Whyatt

    Deformation of underground salt, trona and potash mines is generally time dependent, providing for gradual adjustment of strata to mining induced stresses. Time dependence can allow for higher extract

    Jan 1, 2008