Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Milling of Integrated Sulfide-Oxide Ores

    By Paul M. Jr. Musgrove, Thomas D. Henderson, Mark B. Nesbitt

    Introduction History. Vat leaching operations began in October 1953. Since that time, about 4.2 million tpy of oxide ore averaging 0.72% copper have been treated. Economic conditions, improved operat

    Jan 1, 1985

  • SME
    Mine Modernization Of AMAX?s Carlsbad Property

    By Robert E. Kirby

    The potash mine and refinery of AMAX Chemical Corporation is located 26 miles east of Carlsbad on the north end of the potash producing areas. This property was developed between 1949-1952 and product

    Jan 1, 1974

  • SME
    Analytical Approaches To Organic Matter In Ore Deposits

    By Andrew P. Gize

    The analytical approaches used to solve a specific problem are dependent upon the information required, coupled with limitations imposed by available facilities, costs, and time. The organic matter as

    Jan 1, 2013

  • SME
    Borates - Past, Present And Future

    By S. J. Lefond

    Most people, when Borates are mentioned, mentally visualize the famous twenty mule team (really eighteen mules and two horses), trudging across the Mojave Desert or "she burns green Rosie, we are rich

    Jan 1, 1980

  • SME
    Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021

    By Steven W. Hunt, Glen R. Frank

    Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1

    Jun 13, 2021

  • SME
    Present Methods and Future needs in Iron Concentrates Dewatering and Process Water Reclamation

    By Jan Wolf

    The iron ore industry presently utilizes two types of de-posits. The first are the high grade deposits generally located in remote areas and, secondly, the low grade de-posits which are normally found

    Jan 1, 1971

  • SME
    A Mine Valuation Model Incorporating Risk Adjustment And Differential Cost Escalation

    By R. W. Lake

    The decision to develop an ore body can lead to multi-million dollar profits, or equally substantial losses. Accordingly, the effort required to adapt a valuation model to the specific proposal at han

    Jan 1, 1977

  • SME
    Baffled-Column Flotation Of A Coal Plant Fine-Waste Stream (c115aacc-9fc7-435d-b4fa-d86803716a49)

    By S. K. Kawatra

    It is common in coal-cleaning operations to produce a fine waste stream which contains a considerable amount of coal, but which is not economical to recover both because it is mixed with large amounts

    Jan 1, 1994

  • SME
    Henderson No. 2 Shaft -The Sinking And Equipping Of A Large Diameter Concrete Shaft

    By Allan G. Provost

    Shaft construction is assuming ever increasing importance when new mining enterprises are considered. The reasons for this increased emphasis is the much greater depths at which many new ore-bodies ar

    Jan 1, 1972

  • SME
    Web-Powered Manufacturing Technologies That Focus On Improving Manufacturing Performance

    By Simon Wright, Roland Heersink

    In the past, the center of most companies' e-initiatives has been on reduction of indirect costs, such as selling and procurement. Recently, e-commerce has moved its attention from back-office fu

    Jan 1, 2002

  • SME
    Physical Coal Cleaning To Reduce Illinois No. 6 Seam Coal's Slagging Potential (4d6d8d96-e462-4178-9f9b-1fc25a23eea6)

    By Clark D. Harrison

    This paper compares the ash slagging potential of Illinois No. 6 Seam coal: as raw coal; as commercially cleaned coal processed in a baum-jig plant; and as coal cleaned to a reduced ash specification

    Jan 1, 1984

  • SME
    A Carbon Monoxide Index Monitoring System In An Underground Coal Mine

    By David Burgess

    The paper describes experiments at the Somerset Mine, Colorado, under a cooperative agreement between U.S. Steel and the U.S. Bureau of Mines. A test was made of the tube bundle method of mine air sam

    Jan 1, 1975

  • SME
    Computerized Determination Of Mine Planning Data From Borholes

    By Christopher Haycocks

    The growth of computer and ground control technology in recent years, combined with an urgent demand for low-cost fossil fuels and mineral resources, has set the stage for full-scale utilization of co

    Jan 1, 1973

  • SME
    Borehole (Slurry) Mining Of Coal And Uraniferous Sandstone

    By George A. Savanick

    The objective of this paper is to review advances in the art of borehole (slurry) mining made by the Bureau of Mines. The introduction gives historical and general background information on borehole m

    Jan 1, 1979

  • SME
    Quebrada Blanca, Chile An Enriched Porphyry Copper Deposit

    By John P. Hunt

    Early disseminated copper mineralization at Quebrada Blanca, Chile, accompanied 38 million year old quartz monzonite stocks and dikes. Early mineralization was followed by hydrothermal mineralization,

    Jan 1, 1981

  • SME
    Optimal Sizing Of Conventionally-Sunk Ventilation Shafts Based Upon Capital And Operating Criteria (e05ee128-628b-45f8-8a69-2e8e36ccc831)

    By Y. J. Wang

    The selection of a shaft size for ventilation purposes is a classic problem of concern to mining engineers. This presentation is concerned with the sizing of conventionally-sunk circular shafts with c

    Jan 1, 1977

  • SME
    Broken Aro Remining/Reclamation Project

    By S. Mafi

    The Broken Aro project is associated with a 1910 abandoned underground mine complex that has been discharging aeid mine drainage from entries, seeps and springs. The Ohio Department of Natural Resourc

    Jan 1, 1998

  • SME
    Retreatment & Stabilization Of The Naturita Tailing Pile Using Heap Leaching Techniques ? Introduction

    By R. E. Scheffel

    In February, 1976, Ranchers Exploration and Development Corporation obtained an option from Foote Minerals, Inc., to evaluate reprocessing of two uranium tailing piles. Foote received ownership of the

    Jan 1, 1981

  • SME
    Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low Overburden

    By Chris Ashton, Andreas Rädle, Taner Aydogmus

    "The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich

    Jan 1, 2016

  • SME
    Analysis of the behavior of the weld mesh and the rolled mesh against static loads and a dynamic impact, to design the overlap according with the connection method. - RASIM2022

    By R. Brändle, R. Luis-Fonseca, R. Cornejo, G. Fischer, G. Von Rickenbach, J. Jarufe

    Rock damage around underground excavations has been an important hazard in mines and tunnels. Rock dilation generates buckling that needs to be contained before it causes damage to equipment or safety

    Apr 26, 2022