Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Technical and Economic Assessment of Subsurface Rock Mass Deformation and Pore Pressure Monitoring Using a Network of Wireless Devices

    By C. Holck, J. Yarmuch, J. Read

    "Steepening of slopes provides the means to reduce waste extraction and increase ore recovery in open pit mines; however, it may also adversely affect safety by posing a higher risk of slope failure.

    Nov 1, 2018

  • SAIMM
    Validating the design of blending piles through a real case study

    By L. A. Abichequer

    ROM grade variability is one of the most important factors influencing plant product recovery. Due to the influence of grade variability on mine profits, it is deemed important to guarantee a proper h

    Jan 1, 2009

  • SAIMM
    Determination Of Drawpoint Spacing In Panel Caving: A Case Study At The El Teniente Mine ? Synopsis

    By R. L. Castro

    Currently, in several caving operations, the spacing between the drawpoints is determined by consulting Laubscher's design guide (Laubscher 1994, 2000), a methodology based on the gravity flow ch

    Jan 1, 2012

  • SAIMM
    A Stochastic Cut-Off Grade Optimization Model to Incorporate Uncertainty for Improved Project Value

    By J. Githiria, C. Musingwini

    "Cut-off grade is a decision-making criterion often used for determining the quantities of material (ore and waste) to be mined, ore processed, and saleable product. It therefore directly affects the

    Mar 1, 2019

  • SAIMM
    Theoretical And Practical Aspects Of Cr(VI) In The South African Ferrochrome Industry ? Synopsis

    By J. P. Beukes

    The production of ferrochrome alloy from chromium bearing chromite ores is conducted at high temperature under highly reducing conditions. However, albeit completely unintended, it is impossible to co

    Jan 1, 2010

  • SAIMM
    Long Hole Drilling For The Platinum Industry - A Mining Perspective

    By S. Rupprecht, G. Rapson

    Long blast hole drilling has been successfully implemented since the 1950s in caving operations, steeply dipping wide reefs and boxhole/raise developments worldwide. However, when applying long hole d

    Jan 1, 2004

  • SAIMM
    Developments In The Dredging Industry

    By P. M. Vercruijsse

    Dredging is an industry in constant transformation. It has changed tremendously in the last decades. The traditional dredging activity, like construction and maintaining ports and harbours, desilting

    Jan 1, 2007

  • SAIMM
    Informal Settlements and Mine Development: Reflections from South Africa’s Periphery

    By L. Marais, S. Denoon-Stevens, J. Cloete

    "Historically, mining companies worldwide provided housing and developed towns to accommodate their employees. At the end of the 1980s this approach became less prevalent and attempts were made to mit

    Oct 1, 2018

  • SAIMM
    Integrated Short- And Medium-Term Underground Mine Production Scheduling ? Synopsis

    The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob

    Jan 1, 2012

  • SAIMM
    Recovery Of Zircon From Sattankulam Deposit In India - Problems And Prospects

    By S. Asokan, Ch. V. G. K. Murty, R. Upadhyay

    Zircon (ZrSiO4) is the most frequently found zirconium ore occurring in heavy mineral sands, from which it is extracted as a co-product in the production of ilmenite and rutile. Estimated world reserv

    Jan 1, 2007

  • SAIMM
    Ranking the efficiency of selected platinum mining methods using the analytic hierarchy process (AHP)

    By C. Musingwini

    The South African platinum mining industry is using a number of different mining methods, including variations of the same method, to extract the narrow reef tabular platinum deposits of the Bushveld

    Jan 1, 2008

  • SAIMM
    The Application Of Multi-Parametric Block Models To The Mining Process

    The development of 3D multi-parametric models facilitate the provision of resource information well in advance of the mining face. Using the model, one can evaluate mining areas not only for grade and

    Jan 1, 2006

  • SAIMM
    A Review Of Real-Time Optimization In Underground Mining Production

    By Z. Song

    Real-time monitoring makes it possible to detect any disturbance occurring in production, while decision instruments can efficiently assist decision-makers to optimize production, reduce iterative wor

    Dec 1, 2013

  • SAIMM
    Integrated Seismic Imaging System for Geological Prediction During Tunnel Construction

    By P. Otto, G. Borm, Th. Dickmann, F. Amberg, R. Giese

    Based on many years experience, the well proven Swiss Tunnel Seismic Prediction System TSP has been substantially augmented for online geological prognosis in underground construction. In its latest v

    Jan 1, 2003

  • SAIMM
    Mechanical Sampling - A Manufacturer?s Perspective

    With the advent of the First World Conference on Sampling and Blending (WCSB1) in Denmark in 2003 and the subsequent biannual meetings, together with other sampling conferences held on a regular basis

    Jan 1, 2014

  • SAIMM
    Quantification of uncertainties in geological modelling of kimberlite pipes

    By D. Farrow

    Future development of kimberlite mines is now focused on mining at deeper levels. The consequences are increased difficulty and costs of the mining operations. The decisions on investments require acc

    Jan 1, 2003

  • SAIMM
    Planning Open Pit Mining Operations Using Simulation

    By Peter N. Calder, Alan Bauer

    The complexity of modem open pit load-haul-dump systems is described, and the need for realistic working models is pointed out. Both standard and probabilistic simulation procedures are discussed, pro

    Jan 1, 2014

  • SAIMM
    Designing for Extreme Events in Open Pit Slope Stabilty

    By L. Lorig

    "Two types of extreme event, earthquakes and rainfall, potentially affect open pit slope stability. In the case of earthquakes, there are rather well-developed analysis procedures and acceptability cr

    Jan 1, 2016

  • SAIMM
    Modelling of a steel belt sinter process

    By J. H. Zietsman, W. J. Leipoldt

    "To be able to responsibly develop a multiphysics model of the steel belt sintering (SBS) process used to sinter chromite fines, it is important to have a comprehensive understanding of the process. T

    Jan 1, 2014

  • SAIMM
    Increased productivity with AC drives for mining excavators and haul trucks

    By G. M. Brown, B. J. Ebacher, W. G. Koellner

    Introduction There is a continual economic push to increase the productivity of mobile material handling equipment used in open pit mines. This includes the largest electrical machines: excavators

    Sep 1, 2001