Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Selection of an Appropriate Leaching Method for Light Rees from Esfordi Flotation Concentrate Based on Mineral Characterization

    By D. Moradkhani, S. M. Javad Koleini, M. Abdollahy, F. Soltani

    "The objective of the study was to determine the type and distribution of rare earth elements (REEs) in the phosphate flotation concentrate from the Esfordi flotation plant in central Iran, in order t

    Jan 1, 2017

  • SAIMM
    A statistical approach to some basic mine valuation problems on the Witwatersrand - Introduction

    By D. C. Krige

    The estimation of the tonnage and grade of payable ore in a mine and the correct policy of selective mining based on such estimates, is of vital importance to the mining engineer it is surprising, the

    Jan 1, 1994

  • SAIMM
    Sustainability Of Innovative Management Practices Of Geotechnical Risk At Damang Pit Cut Back (Dpcb) ? A Case Study At Gold Fields Ghana, Damang Mine

    By E. Dadzie

    This paper will review some methods used to manage geotechnical risk at Damang Pit Cutback. The pit depth is designed up to 250m with push back on the eastern and western walls of the existed and depl

    Jan 1, 2008

  • SAIMM
    Modelling unsaturated dual-phase flow through crushed ores for heap leaching

    By J. Petersen, S. W. Robertson

    Heap leaching is used extensively for the processing of low-grade copper, gold, and uranium ores. The hydrodynamics is often the most important factor that limits the rate of metal recovery. Over the

    Dec 11, 2024

  • SAIMM
    Tailings Storage Facility stability monitoring using CPT data analytics on the Zelazny most facility APCOM 2021

    By P. Stefanek, N. Duda, B. Jachni, P. Stefaniak, B. Bursa

    The Zelazny Most Tailings Storage Facility (TSF) is the largest reservoir of post–flotation tailings in Europe. The total amount of tailings from the mines in Lubin, Rudna, and Polkowice are stored ea

    Sep 1, 2021

  • SAIMM
    The current limited impact of Witwatersrand gold-mine residues on water pollution in the Vaal River system

    By D. D. Marsden

    This paper discusses the concentrations of sulphides and total sulphur in widely spread regions around mine residue deposits, from which rain-water run-of can enter the Vaal River system. Analyses of

    Jan 1, 1986

  • SAIMM
    Monitoring, repair, and safety practices for electric furnace matte tapping

    By L. Thomson

    "The smelter at Sudbury Integrated Nickel Operations, located in Sudbury, Ontario, operates a single electric AC furnace. This furnace treats nickel sulphide concentrates produced by Glencore and thir

    Jan 1, 2014

  • SAIMM
    A model of capital expenditure for gold-mine, planning

    By J. A. L. Napier

    An essential requirement for the planning of the global capacity of a mine is a knowledge of the functional relationship between the production level and the capital expenditure necessary to establish

    Jan 1, 1981

  • SAIMM
    Financial Evaluation Of Electric Rock Drills For In-Stope Mining In Platinum Operations

    By P. J. Petit

    Financial evaluation is necessary to investigate the viability of implementing and/or utilising new technology in mining projects. It establishes a techno-economic base for decision-making and justifi

    Jan 1, 2006

  • SAIMM
    Contributions to the paper 'Uneconomic gold production in South Africa'

    By H. L. Monro

    Contribution by B. K. Martust I congratulate the author on his interesting paper. In my view, the establishment of the level at which South African gold output is at some kind of optimum is an interes

    Jan 1, 1984

  • SAIMM
    75th Anniversary of the South African Institute of Mining and Metallurgy Review of the Institute Affairs

    By R. C. J. Goode

    "In my Presidential address last year `The Institute in Retrospect and Prospect', I briefly reviewed the past activities of our Institute, I commented on the dynamic growth of the mineral activit

  • SAIMM
    Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System ? Synopsis (cd7f692e-c8f8-43df-8e10-650656e74357)

    By N. Hanief

    This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per

    Jan 1, 2012

  • SAIMM
    Selective Blast Mining In Gold Mines

    By I. Bock

    This presentation describes a technique under development referred to as Selective Blast Mining. The technique involves millisecond sequential blasting. It applies to mines where the gold bearing cong

    Jan 1, 1996

  • SAIMM
    Conditioning in the flotation of gold, uranium oxide, and pyrite

    By F. J. N. Stassen

    SYNOPSIS The effect of conditioning energy on the flotation of gold, U308, and pyrite was investigated in the range 0,1 to 100 kWh per tonne of dry ore for various combinations of conditioning time a

    Jan 1, 1991

  • SAIMM
    The acid leaching of nickel and copper from sulphidic ore in the presence of pyrite

    By M. J. Southwood

    SYNOPSIS Experiments carried out under atmospheric pressure and temperature (25°C) and sterile conditions show that the dissolution rate of nickel and copper from a pyrrhotite-pentlandite-chalcopyrit

    Jan 1, 1985

  • SAIMM
    Flotation flowsheet for eliminating pyrite in tailings: a cleaner production solution, Y.L. Botero, L.A. Cisternas, L. Cortes, and A. Lopez-Valdivieso

    By L. A. Cisternas, A. Lopez-Valdivieso, Y. L. Botero, L. Cortes

    In the processing of sulfidic ores, pyrite is usually depressed and ends up in the tailings. However, pyrite is the most common species responsible for acid mine drainage (AMD) due to its spontaneous

    Jan 1, 2020

  • SAIMM
    The Jwaneng Resource Extension Project -Defining The Resource, Shaping The Future

    By M. A. Roberts

    Oebswana's Jwaneng Mine (south-central Botswana) is the richest diamond mine? in the world and has been contributing substantial revenue to Botswana since the mine started operating in 1982. The

    Jan 1, 2010

  • SAIMM
    Advanced process control for coal flotation: a case study of the approach and benefits of a structured digitalisation program APCOM 2021

    By T. Bohmer, L. Auret, N. Pillay, Z. Horn, P. Rambalee, A. Haasbroek

    As part of a broader digital technology-enabled transformation programme, a major mining company is systematically implementing Advanced Process Control (APC) solutions and associated instrumentation

    Sep 1, 2021

  • SAIMM
    Pragmatism in industrial modelling: An application to ladle lifetime in the steel industry

    By S. T. Johansen, B. T. Løvfall, T. Rodriguez Duran, J. Zoric

    A methodology for building pragmatic physics-based models is here adapted to predict the erosion of ladle linings in the steel industry, in order to support operators when deciding whether the lining

    Apr 16, 2024

  • SAIMM
    Los Bronces Development Project

    By Nelson Sánchez

    The Los Bronces Development Project (LBDP) was approved in October 2007 by the Anglo American plc Board at a capital cost of some US$1.74B, and is scheduled to be completed by the end of 2010. The pro

    Jan 1, 2008