Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • ISEE
    Ore guiding in underground mining using MWD and machine learning

    By J. Sanchidrián, A. Fernández, P. Segarra

    The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi

    Jan 1, 2024

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    A full-field solution to predict vibrations in the presence of a free surface

    By J. A. Sanchidrián, P. Segarra, S. Gómez

    Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac

    Jan 1, 2024

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Safe Blasting Parameters And Seismic Influences During Construction Blasting

    By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek

    The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,

    Jan 1, 2009

  • ISEE
    Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil

    By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo

    The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel

    Jan 1, 2012

  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Modern Underground Raise and Slot Design

    By N. Rouse

    Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the

    Jan 1, 2024

  • ISEE
    Determination of Presplit Borehole Pressure

    By Dr. Paul Worsey, Dr. Calvin Konya, Dr. Anthony Konya

    Development of methods to calculate presplit blasthole pressures through simplified models, namely the Empirical Model and the Detonation Pressure Model. These models can be used with variations in ex

    Feb 1, 2020

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    SmokeFCM: Segmentation of Quarry Blast Smoke Plumes using Self-Adaptive Weighted Fuzzy C-Means

    By E. Lentilucci, A. Dey, X. Liu, A. Datta, S. Ghosh

    The segmentation of quarry blast smoke plumes is a crucial research area that has the potential to enhance safety, environmental monitoring, object detection, and regulatory compliance in the mining i

    Jan 1, 2024

  • ISEE
    Journal: 100 Years / A Trip Through The Anthracite Coal Mines

    By Robert Hopler

    RBH Note: in 1913 black powder was still dominant as a coal-mining explosive, but permissible explosives were making some slight headway. For example, in 1902 there were only 11,300 pounds of permissi

    Jan 1, 2014

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025