The clay products industries of OntarioBy G. R. Guillet
"Bricks made from local Paleozoic shales, and floor and wall tiles made from imported clays, both established record production volumes in 1985 and are the strongest segments of Ontario's clay pr
Jan 1, 1988
-
Canadian Exploration Incentive ProgramBy Robert B. Parsons
"The Canadian Exploration Incentive Program (CEIP), which was announced by the federal government on May 3, 1988, promises to maintain the viability of flow-through shares as a financing mechanism whi
Jan 1, 1988
-
New developments in the mining of underground pillars at Thompson MineBy Rod Maclean, George Stewart
"This paper covers the planning, development, and mining of an underground pillar complex using a bulk mining method. To achieve the long-term goal of continually improving our operating processes, al
Jan 1, 1988
-
Economic Benefits of Operating a Copper Electrorefining Tankhouse at High Current Density Using the Mettop-BRX-TechnologyBy I. Filzwieser, S. Konetschnik, A. Filzwieser, A. Anzinger
Production in copper electrorefining tankhouses mainly depend on two factors: The deposition area, which is a result of the amount of installed cells and cathodes, as well as the current density - the
Jan 1, 2014
-
Operation of the Boliden Lead Kaldo Plant for treatment of lead-bearing dustBy Per-Lennart Nystedt
"The Boliden Lead Kaldo Plant for the treatment of lead bearing flue-dust from the Copper Smelter and the Slag Fuming Plant has been in operation at the Ronnskar Works of Boliden Metall since the midd
Jan 1, 1980
-
A study of the behaviour of tubing when injected into molten steelBy Mario Giavani
"IntroductionBy the 1980s, the continuous casting process had almost replaced the ingot casting of steel in Japan, Europe and North America. While economic benefits were probably initially the prime m
Jan 1, 1991
-
What makes a mining project-financial optionsBy R. R. Stone
"This paper will examine the role of debt and equity in project financing and will illustrate the impact on the return to the project sponsor of each type. Conventional debt sources will be examined,
Jan 1, 1980
-
Kiruna Electric-a technological breakthrough in inclined ore haulageBy B. Morrison
"The Kiruna Electric System is a recently developed inclined ore haul age system for underground mining operations. Although an initial investigation was carried out at the Swedish underground iron or
Jan 1, 1989
-
In-the-hole drilling at Heath Steele Mines LimitedBy Errol Ladner
The application of large-diameter bore holes in underground operations at Heath Steele was first tried in February, 1975. Since that time, 90,000 feet of 6-l/2-inch holes have been drilled, primarily
Jan 1, 1979
-
Management of Socio-Economic Impact Analysis for Resource DevelopmentBy William E. Stanley
The paper examines the problems that arise in undertaking socio-economic impact studies to meet the requirements of environmental-impact legislation governing new mine development or expansion. An app
Jan 1, 1979
-
Process Metallurgy in Circular Economy System Design: The Copper and Base Metal Value ChainBy A. Abadías Llamas, N. Bartie, M. Stelter
Evaluating the economic viability as well as the sustainability of the Circular Economy (CE) system requires a deep understanding of the distribution of all elements, compounds, alloys, materials etc.
Jan 1, 2019
-
Electrolytic copper refining reviewedBy John H. Schloen
"The object of this paper is to review electrolytic copper refining as it was in 1954(1), as it is now in 1984, and to comment on the many improvements which have been made in the last thirty years.In
Jan 1, 1986
-
Attracting students to the mining, minerals, metallurgical and petroleum industries - An overview of the position paper of the CIM Careers Task ForceBy Susan W. Campbell, Bruce Regensburg
"The CIM Careers Task Force has addressed industry's concern of a perceived shortage of skilled personnel over the coming decade. The industry is faced with a fundamental shift by young Canadians
Jan 1, 1993
-
Underground crusher and conveyor system at Ruttan Mine, Sherritt Gordon Mines Ltd.By S. K. Paul
"This paper briefly describes the underground crushing and conveying system at Sherritt Gordon Mines' Ruttan Mine. A series of three steel-cord belted conveyors, with a total length of 2J55 metre
Jan 1, 1980
-
Recovery of Rare Earths from By-Products in Phosphoric Acid Manufacturing ProcessBy J. Shibata, N. Murayama
"Rare earth elements are present in more than 100 minerals, of which monazite, bastnaesite and xenotime are typical. Rare earth elements have excellent chemical and physical properties for industrial
Jan 1, 2014
-
Emergency hoist system at PCS MiningBy Donald Roberts
"Parameters f or design and development of an emergency hoist system (Fig. I) were submitted to Timberland Equipment Limited of Woodstock, Ontario by the Potash Corporation of Saskatchewan Mining Limi
Jan 1, 1986
-
Geology of the Lake George antimony deposit southern New BrunswickBy A. A. Ruitenberg, C. J. Morrissy
"The Lake George antimony deposit comprises a system of stibnite-bearing quartz veins that cut Silurian greywacke and slate. The stibnite-bearing ore zone is in part enveloped by a uraniferous zone.Th
Jan 1, 1980
-
A Review of Copper Electrorefining Operating Data - 1987 To 2013By Michael S. Moats, Shijie Wang, Timothy Robinson
In 1987, John Schloen published a survey and analysis of copper electrorefining tank room data. Following this paper, a series of copper electrorefining surveys have been conducted and presented at ea
Jan 1, 2014
-
Geological Controls in Resource/Reserve EstimationBy A. J. Sinclair
"Abstract-Geology contributes essential information toward obtaining high-quality resource/reserve estimates. In this context, geology can be considered under the following overlapping topics: regiona
Jan 1, 1998
-
A Techno-Economic Evaluation of the Use of Seawater for Copper FlotationBy Nawshad Haque, Leanne Smith, Hal Aral, Joseph Cho, Warren Bruckard
"Water availability is one of the principal parameters in determining the feasibility of mining projects in arid and semi-arid regions. The volumetric water footprint (VWF) of a conceptual model of a
Jan 1, 2016