Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Gas Holdup Estimation Using Maxwell Equation in Flotation Systems: Revisited

    By L. Magne, A. Pinto, M. Maldonado, J. A. Finch

    Estimation of gas holdup from electrical conductivity measurements has been used in lab and industrial installations. The approach is based on the application of Maxwell's model, which relates the con

    Jan 1, 2016

  • CIM
    Mine Hoist Plant Design Fundamentals

    By R. A. (Dick) McIvor

    "It is important to ensure that the basic mine hoist plant design fundamentals are incorporated into any new mine hoist plant project before detailed design engineering is commenced. Some of the basic

    Jan 1, 2019

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • CIM
    Recovery of Magnetite from Spiral Tailings at Labrador City

    By T. C. Murphy, W. Taciuk

    In 1966, the Iron Ore Company of Canada commissioned a wet magnetic scavanging plant for the recovery of fine magnetite values p.resent in spiral tailings discharged from a spiral gravity separation p

    Jan 1, 1972

  • CIM
    Improvement of Cerium Recovery from Rare Earth Ore by Mechanochemically Activated Leaching

    By G. Granata, C. Tokoro, T. Kato

    "The goal of this study was to evaluate the effectiveness of mechanochemical activation by planetary milling as method to enhance the recovery of cerium from rare earth ores. For this purpose, a weath

    Jan 1, 2017

  • CIM
    Real-Time as-Built Tunnel Product Modeling and Visualization by Tracking Tunnel Boring Machines

    By X. Wu

    Tunnel Boring Machines (TBMs) are widely used for tunneling in urban areas because of their high advance rate, precise as-built profile and minimal impact to buildings and traffic on the ground. For a

    Aug 1, 2013

  • CIM
    Experimental Study for Deoxidation of Liquid Copper with Substoichimetric O2/CH4 Flames

    The rate of liquid copper deoxidation during top blowing of reducing flames has been investigated using a high capacity thermogravimetric unit at 1200 °C. For 1 kg copper samples, it was observed that

    Jan 1, 2007

  • CIM
    Optimization of Microwave-Ultrasound Assisted Leaching of Copper Anode Slime Based on Central Composite Design

    By Z. Y. Ma, H. Y. Yang

    The process of microwave-ultrasound assisted leaching of valuable metals from copper anode slime was proposed in this paper. Design of experiments has been used to study the effect of the main leachin

    Jan 1, 2014

  • CIM
    Passive Seismic Tomography for Imaging Horizontal Stress Concentration at the Mine Scale

    By Erik C. Westman

    Knowledge of the orientation and relative magnitude of in-situ stresses at the mine scale is important for safe and efficient production from an underground mine. With this knowledge, stope location a

    Jun 1, 2012

  • CIM
    Recent Developments in Rock burst Research at Lake Shore Mines

    By Ernest A. Hodgson

    A SERIOUS hazard which must be faced in some mines, though quite absent in others, is that of rockbursts. Bursts cannot be wholly avoided in such mines, but the hazard would largely disappear if they

    Jan 1, 1943

  • CIM
    Mechanism Analysis and Control Technology for Strong Strata Behaviors in Shallow Depth Seams While Mining out of the Concentrated Coal Pillar in Upper Room and Pillar Goaf

    By Yin Wang, Lin Li, Zhongwei Bi, Like Wei, Wen Li, Shaogang Li, Bin Zhang, Hongjie Li

    Presently,Many long-wall fully-mechanized faces in shallow depth coal seams are below room and pillar goaf in Shendong mining area. When the working face is advanced out of concentrated coal pillar in

    Jan 1, 2015

  • CIM
    Recovery of Tin from Used Lead-Free Solder by Electro-Refining in Sulfuric Acid Solutions

    By B. D. Pandey, M. S. Kim, B. S. Kim

    The recovery of Sn from used Pb-free solder (Sn, 3~4 % Ag, < 0.9 % Cu, < 1.2 % Pb) has been investigated by electrorefining in sulfuric acid solutions containing small amount of hydrochloric acid. Thi

    Jan 1, 2014

  • CIM
    3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning

    There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric

    May 1, 2009

  • CIM
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Oct 1, 2024

  • CIM
    Unexpected Legal Obligations Arising in Mining Joint Ventures

    By W. S. (Steve) Vaughan

    The Origins of Joint Ventures in Canada?s Mining Industry ? Among the most important financing structures used in our mineral industry today ? Virtually unheard of in the Canadian industry prior

    May 1, 2013

  • CIM
    Strength Development and Characteristics of Sodium Silicate-fortified Sand Pastefill/The Effect of Binder Content, Sodium Silicate Concentration, and Pulp Density

    By M. Razavi

    This investigation is part an overall investigation on the effect of sodium silicate on the properties of the mine backfill. The results presented will highlight the effects of binder dosage, sodium s

    May 1, 2007

  • CIM
    Electrochemical Behavior of Axj530 Magnesium Alloy in Neutral Medium

    By S. Amira

    The corrosion behavior of high pressure die-cast and thixocast AXJ530 magnesium alloys has been investigated in 0.05M NaC1 solution at pH 6.0 using potentiodynamic polarization tests, electrochemical

    Jan 1, 2006

  • CIM
    A Hollow Cylinder Testing Device to Study at Small Scale the Damaged Zone around Underground Openings in Porous Rocks

    By V. Labiouse, F. Orellana

    "Hollow cylinder samples can be tested for both the characterization of rock properties and the physical modelling at reduced scale of engineering applications. Particularly, this type of experimental

    Jan 1, 2015

  • CIM
    Coal Production by Contract Strip Mining

    By W. J. Blackstock

    Introduction To The great majority of people, the term &apos;strip coal&apos; has little or no meaning, or if it has any significance it is thought to refer to a poor grade of coal that had to be a

    Jan 1, 1949

  • CIM
    Use of Imagery Technology for Dimensional Control of Engine Parts

    By M. Côté, H. Pépin, Y. Richer, C. Gingras

    Rolls-Royce Canada has been nominated as a Rolls-Royce Center of Excellence for repair of fan blades in 2003. One of the challenges of the Rolls-Royce Canada Component Repair Center of Excellence team

    Jan 1, 2006