    Kinross Paracatu, Start-Up and Optimization of Sag Circuit

    By Junior Santos

    Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several

    Jan 1, 2012

  • CIM
    The NioCorp Development Elk Creek Project: A Shaft Design Case Study

    By Chris Dougherty

    "This presentation will provide a demonstration of the methodology used in designing a modern shaft and hoisting plant utilizing a review of the challenges faced and solutions delivered for the Elk Cr

    Jan 1, 2019

  • CIM
    Aspects of mining R&D in Australia (765b26a3-c30d-4d4d-843b-4cdffd30f3eb)

    "The Cooperative Research Centre for Mining Technology and Equipment (CMTE) is funded by the Commonwealth Government, by its mining research members — the Universities of Queensland and Sydney and the

    Jan 1, 2001

  • CIM
    Cu Extraction from Naturally-Sourced CuFeS2 Coupled to Zn Electrowinning in a Battery-Like System

    By K. M. Deen, E. Asselin

    Hydrometallurgical processes, i.e., Cu extraction from a mineral concentrate and Zn electrowinning, are coupled in a battery-like system. A naturally-sourced CuFeS2 concentrate mixed with activated ca

    Jan 1, 2019

  • CIM
    The Monteagle Nepheline Corundum Mica Deposit Hastings County, Ontario

    By H. L. Noblitt, Pauline Moyd, Louis Moyd

    The deposit, which forms a ridge -adjacent to the York river, in Mont-eagle township, is held by Monteagle Minerals Limited, of Toronto. The ore is in a Precambrian gneiss which is composed of nepheli

    Jan 1, 1962

  • CIM
    Rock Breakage by Hydraulic Hammer: Comparative Study Between Scale Model in Laboratory and in Numerical Simulations

    The dynamic breakage process of rocks by the impact of a hydraulic hammer is more complex than one normally assumes. It is even more difficult when one has to conduct the breakage under water. In such

    Aug 1, 2013

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    The Current Immsa Jarosite Circuit

    By C. Moctezuma

    Since the start up of the IMMSA electrolytic zinc refinery in 1982, the dissolved iron coming from the acid attack of the ferrites has been precipitated by the jarosite process. At the beginning of op

    Jan 1, 2006

  • CIM
    Pumping Ores Up Vertical Shafts

    By Ellie Condolios

    Hydraulic hoisting offers a number ~f attractive features over conventional hoisting methods: small shaft space requirements; great flexibility of layout, including pick-up or delivery of the material

    Jan 1, 1963

  • CIM
    Lessons Learned : The Shifting Sands of Shareholder Value Legal and Financial Trends

    By Erik Richer La Fleche

    LEGAL RISKS LEGAL RISKS ARE COUNTRY RATHER THAN PROJECT RISKS OTHER COUNTRY RISKS ARE POLITICAL AND MACRO-ECONOMIC RISKS COUNTRY RISKS ARE EXAMINED AFTER PROJECT RISKS COUNTRY RISKS COUNTRY

    May 1, 2013

  • CIM
    The Cablebolting Cycle —Underground support engineering

    By D. Jean Hutchinson, Mark Diederichs

    "Cable bolts are an important support component in modern underground mines. If an optimized cable bolt system is to be achieved, it is insufficient to focus on cable bolt layout design or on cable bo

    Jan 1, 1996

  • CIM
    The Charge Induction Dust Measurement Method Based on Detrended Fluctuation Analysis

    By D. D. Liu

    This paper proposes a charge induction dust measurement method based on detrended fluctuation analysis (DFA) for use in coal mine environments, based upon electrostatic interference, dust properties,

    Aug 1, 2013

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • CIM
    An Energy Based Approach to Quantifying the Response of AG/SAG Mills to Ore Blends

    Experimental determination of the response of an AG/SAG mill treating two components of significantly different impact resistance is challenging for two main reasons: firstly, small scale laboratory t

    Jan 1, 2012

  • CIM
    Open Pit Drilling and Blasting at Craigmont Mines Limited

    By J M. Gibbs

    Craigmont Mines Limited mine 50,000 tons of ore and waste per day from the open pit at Merritt, British Columbia. An electric-powered "down-the-hole" drill, a diesel-powered rotary drill and two elect

    Jan 1, 1965

  • CIM
    Economics of treating gold ores

    By K. G. (Ken) Thomas

    "This paper gives an insight into the various processes available to treat gold ores. A brief overview is given of the various types of refractory gold ores. Particular emphasis is given /0 comparing

    Jan 1, 1991

  • CIM
    The Respirable Dust Concentration Information Transmission Method Based on Led Light Equipment

    By C. R. Tang

    The respirable dust real-time monitoring equipment export information is complex, and electromagnetic wave wireless transmission is affected largely under mine conditions. The respirable dust concentr

    Aug 1, 2013

  • CIM
    Quantitative Metallography of Titanium Alloys

    By D. Furrer, M. Dallaire

    The arrival of Image analysis in the last 20 years has changed the world of quantitative metallography. Many standard measurement techniques which were previously manual can now be done with fully aut

    Jan 1, 2006

  • CIM
    Development of a simple segregation program to manage potentially acid generating waste rock at the Keystone Gold Mine, Manitoba

    By D. H. Flather, J. W. Hendry, K. Drover

    Black Hawk Mining Inc. has completed a comprehensive program on the prediction and management of acid rock drainage (ARD) at their Keystone Gold Mine (Keystone) near Lynn Lake, Manitoba. The program,

    Jan 1, 2000

  • CIM
    Selected Compositions Sulfhydryl Collectors and Flotation Kinetics of Sulfide Minerals from Refractory Pyrite Pyrrhotite Ores of Non Ferrous Metals

    By Vladislava A. Ignatkina, Fillip O. Milovich, Vladimir A. Bocharov

    "Complex research of flotation concentrates of monomineral fractions of chalcopyrite, sphalerite, galena, pyrite, pyrrhotite included methods of adsorption of collectors, surface compounds by IR ATR,

    Jan 1, 2016