Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Method for Establishing Site Specific Coal Pillar Design Guidelines

    By Mills KW

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factor

    Jan 1, 1992

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    Basicity of Metallurgical Slags (df15b5da-1878-4c59-91a1-a31e398aa14d)

    By Y Yang

    Despite the importance and usefulness of basicity in metallurgical slags, the optimum quantitative expression of it has remained elusive, partly due to the fact that the precise concept of basicity ha

    Jan 1, 2000

  • AUSIMM
    The Measurement of Explosive Product Gas Penetration

    By Armstrong ME

    The gas bubble energy generated by an explosive plays a major part. in the fragmentation, muckpile movement and damage produced. Previously, the interaction between gas pressure and the rock has b

    Jan 1, 1986

  • AUSIMM
    Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.

    THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,

    Jan 1, 1930

  • AUSIMM
    Geological Assesssment of Natural Gas from Coalseams in the Northern Bowen Basin

    By Johnson D. P, Beamish B. B

    The northern Bowen Basin has a very large resource of coalseam methane gas-in-place - 136 TCF(7ohnson and White, 1988). The gas is pipeline quality, being 98-99 per cent methane with traces of carb

    Jan 1, 1991

  • AUSIMM
    Comparison of Heap Leach Facility Designs

    By Carlson BL, Overton DD

    This paper compares the designs of heap leach facilities for four precious metal mining projects in the southwestern United States. These four proposed projects are of small-to medium-size relative to

    Jan 1, 1997

  • AUSIMM
    Deposit Morphology and Current Efficiency in Electrolytic Zinc Deposition

    By Pollard D, Meadows N

    The presence of impurities which are electropositive to zinc in acid zinc electro- lyte causes changes to deposit morphology and reduced current efficiency. Glue may be added to control some impuri

    Jan 1, 1984

  • AUSIMM
    Fluid and Metal Sources in the Mt Carbine Tungsten Deposit, North Queensland, Australia

    By Forsythe DJ, Sun S-S Andrew AS

    Paragenetic, fluid inclusion, stable isotope, and 87Sr/86Sr and 143Nd/144Nd isotope studies of the Mt Carbine tungsten deposit in North Queensland provide information on the sources of the mineralis

    Jan 1, 1987

  • AUSIMM
    A Basic Study on the Oxidation Smelting of Lead Sulfide

    By Ito H, Noguchi F, Ueda Y

    DTA curves of synthesis lead sulfide and commercial. lead concentrates during oxidation were measured to clarify the mechanism of ox- idation of lead sulfide. The oxidation reac tions could be divid

    Jan 1, 1987

  • AUSIMM
    A Study of the Hydrochlorination Reactions of the Nickel Segregation Process

    By Young D. R, Webb I. D

    The hydro-chlorination of Fe2O3 and Fe304 has been investigated in the range 850-950¦C in order to elucidate the role of iron in the segregation process for nickeliferous laterites. The kinetics o

    Jan 1, 1987

  • AUSIMM
    Appraisal of the Jameson Flotation Cell for Recovery of Cyanide Soluble Copper

    By Harbort G. J

    Jameson cell pilot plant trials were conducted in a number of areas in the Red Dome gold/copper flotation plant during 1991. The aim of testwork was to reduce the amount of cyanide soluble copper re

    Jan 1, 1992

  • AUSIMM
    The Influence of Strata Control and Coal Production on Gassiness and Gas Drainage Efficiency in NewCastle Collieries

    By Larkings RH

    The high gas emissions associated with the depth of mining and very high coal extraction at some Australian Collieries have provided a need to investigate the influence of geological and mining con

    Jan 1, 1986

  • AUSIMM
    Sidewall Fracturing in Coal Room and Pillar and Pillar Extraction Panels

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic model

    Jan 1, 1992

  • AUSIMM
    Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper Operations

    By G W. Croft, L E. Krause

    The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro

    Jan 1, 2005

  • AUSIMM
    Petrology, Geochemistry and Tectonic Implications of Magmatism in Northern Hunter Ridge-Kadavu Island Group (Fiji). (772d3817-ba1c-497f-a5a8-fb10457552d2)

    By Eggins SM, Crawford AJ, Maillet P

    The Fiji Islands are remnants of a once continuous Solomon-Vanuatu-Fiji-Tonga volcanic arc (the Vitiaz arc), located at the boundary between the Indian-Australian and Pacific plates. They record a hi

    Jan 1, 1995

  • AUSIMM
    Artisanal and Small-Scale Gold Mining in Papua New Guinea

    By E Y. Baafi

    Artisanal and small-scale gold mining (ASSM) offers lucrative employment opportunities to the locals of most developing countries. The major drawback of ASSM is its adverse impacts on the environment

    Jan 1, 2008

  • AUSIMM
    The Intec Copper Process

    By Moyes A. J

    The Intec Copper Process uses a strong chloride electrolyte at atmospheric pressure and 80 - 85¦C to produce high purity, 99.99 per cent copper granules and elemental sulphur. A recent, exhaustive s

    Jan 1, 1992

  • AUSIMM
    Keynote Address The Problems of Strong Roof Beds and Water Bearing Strata in the Control of Longwall Faces

    The difference between a hypothetical and a theoretical approach is considered and the advantages in using a hypothesis is discussed. Virgin horizontal stresses play an important role in stabilisin

    Jan 1, 1986

  • AUSIMM
    Trends in Electricity Generation in the Asia-Pacific Region and Effects of Fuel Mix

    In discussing the Asia-Pacific region weare talking about a region which has more than 60% of the world's population, a regional economy which will in 10 years be larger than the European Economi

    Jan 1, 1990