Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Efficiency Through Integration of Management System

    Managers are demanding efficient use of their resources and part of this demand is leading to the idea of integrated audits for Occupational Health and Safety (OH&S), quality and the environment. I

    Jan 1, 1995

  • AUSIMM
    Regional Stream Sediment Geochemistry Database (REGCHEM) for Selected Regions of New Zealand (c892f7b6-5ca8-457b-966a-25ae463b073f)

    By Christie AB

    Stream sediment geochemical analyses from 140 mining company exploration surveys of the Coromandel, Northwest Nelson, Marlborough and Westland regions of New Zealand have been compiled from open file

    Jan 1, 1995

  • AUSIMM
    Recovery of Copper from Lean-Grade Ores and Intermediate Sources and a New Design of Anode Casting Arrangement for a Small Copper Refinery

    By Chowdhury P. J R, Biswas S. K

    Recovery of metallic values from lean-grade raw materials as well as from secondary/intermediate industrial products is of immense importance to a country like India which is not endowed with extens

    Jan 1, 1992

  • AUSIMM
    Cost Ranking Studies in the Mining Industry

    Whilst decisions to commit projects have traditionally been heavily influenced by hurdle rates for d.c.f. analysis, it is suggested that evaluation of competitors' costs may be a desirable additi

    Jan 1, 1985

  • AUSIMM
    Procedure and Example of Grade Control in Open Pit Mining

    Grade control plays an essential role in the good running of a mine. The factors at play are many, starting from a good analysis of the geology and a correct sampling procedure. Once this is achie

    Jan 1, 1987

  • AUSIMM
    The Art of Plant Practice in Gold Metallurgy with Particular Reference to Hutti Gold Mines Mill

    By Naik J. S G

    The plant practice plays an important role in production and productivity. Men, material and machinery have to be judicially utilised to achieve maximum output with minimum cost. Improvements in techn

    Jan 1, 1992

  • AUSIMM
    Geometry And Stability Determination Of Large Dimension Cut-And-Fill Rooms At Kamoto

    By Blake W

    Based on preliminary computer model simulations and stability analyses, both longi- tudinal and transverse, large dimension, cut- and-fill rooms were designed for the parallel dipping ore layers at

    Jan 1, 1973

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Application and Operation of Fine Hydrocyclone Circuits

    By Childs G, Ritchie IC

    This paper describes the principle and operation of small hydrocyclones for use in the coal, minerals and other process industries. The principles for selecting a hydrocyclone for an application a

    Jan 1, 1984

  • AUSIMM
    Some Aspects of the Chemistry of Carbon-in-Pulp and Resin-in-Pulp Proocesses. Carbon-in-Pulp and Resin-in-Pulp Proceses

    An empirical kinetic model is discussed that enables the number of stages in a carbon-in-pulp plant and the amount of carbon in each stage to be calculated for any desired metallurgical performance.

    Jan 1, 1982

  • AUSIMM
    Development of Drilling Stategy Using Geostatistics - A Case Study in Porphyry Copper Deposit

    By Kim YC

    An alternative development drilling strategy to the one currently in use at an open pit mine was investigated using geostatistics for a portion of the pit. The massive orebody, the 3-D nature of t

    Jan 1, 1986

  • AUSIMM
    The Oroya Shoot and its Relationship to Other Flatly Plunging Ore Pipes at Kalgoorlie

    Acclaimed as one of the most remarkable orebodies anywhere on account of its length and richness, the Oroya Shoot occurs on the eastern side of the Kalgoorlie gold mining district close to the contact

    Jan 1, 1959

  • AUSIMM
    Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium Mine

    The Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of

    Jan 1, 2002

  • AUSIMM
    Determination of Minute Amounts of Lead in Water, with Notes on Certain Causes of Error

    By Hemingway J, Read T. A, Anderson V. G

    IN the determination of very small amounts of lead, the usual analytical methods are far from being satisfactory. Small amounts of lead may be present in the reagents empioyed, and it is customary to

    Jan 1, 1921

  • AUSIMM
    Copper-Gold Ore Leaching: A Kinetic Study on the Ammoniacal Cyanidation of Copper, Chalcocite and Chalcopyrite

    By LaBrooy S. R, Ritchie I. M

    Problems with the cyanidation of copper-gold ores Copper-rich gold ores are becoming increasingly important both within Australia and overseas (Dayton, 1982; Deng and Muir, 1994; Muir et al, 1993; S

    Jan 1, 1997

  • AUSIMM
    Exploration in a Mature Mine - The Mount Isa Mine Strategy

    By Bartrop S. B

    Mount Isa mine has a long history of successful exploration since discovery 70 years ago. Remaining reserves, although substantial, exist in a scheduling framework which involves long-term production

    Jan 1, 1993

  • AUSIMM
    The Evolution of Cut and Fill Mining at Isa Mine

    By Wright J

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Hydraulic Handling In Mining-Fully Automatic Large-Scale Test Unit On A Practical Scale (7820d56d-e8c9-4696-85e5-160c9e5556c0)

    The process of hydraulic transport through pipelines, world-wide well known for the trans- port of fine-grain solids is also being used to a greater extent in mining for the handling of 1rimarily c

    Jan 1, 1980

  • AUSIMM
    Ore Block Modelling and Structural Geology: Their Intergration

    By Hall C. E, Chrisholm J. M

    Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the minera

    Jan 1, 1993

  • AUSIMM
    Accuracy and Anaysis û The Cooper Bulk Analyser at Isa Mine

    A nuclear technique utilising the gamma-ray resonance scattering process is used at Isa Mine for the determination of copper in drill core and bulk mineral samples. The Copper Bulk Analyser (CBA) prov

    Jan 1, 1990