Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Radar-Based Surface Scanning with the World's First Fully Digital Beam Forming Technology Sensor Especially Developed for Mining Productivity and Safety

    By J Berg, M Hahn, R Winkel

    Imaging sensor systems designed for the mining and minerals industry incorporate different physical measurement technologies that can be used to detect the machine environment, such as laser, ultrason

    Sep 26, 2011

  • AUSIMM
    Cogenetic Formation of the Peralkaline Syenite and Oxide Ore-bearing Layered Gabbroic Intrusion of the Baima Igneous Complex, Emeishan Large Igneous Province, South-west China

    By J G. Shellnutt, Y Iizuka, T W-Y Hsia, T-C Liu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of magmatic oxide ore deposits hosted in chemically-evolved layered gabbroic

    Mar 18, 2015

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013

  • AUSIMM
    In situ observation of phase transition of silico-ferrite of calcium and aluminium

    By H Kim, J Park, J Lee

    Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal

    Jun 19, 2024

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn deposit

    By C Artica

    Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st

    May 24, 2023

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    New Rosebery - Discovering the Next 20 Years

    Rosebery Mine is situated on the west coast of Tasmania and is AustraliaÆs largest volcanic-hosted base and precious metals deposit (zinc, lead, copper, gold and silver). The milling operation has bee

    Jan 1, 2008

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Scientific Evaluation of Fauna Sensitivity to Blasting

    By D Martin

    The Rio Tinto (Mount Bruce Mining Pty Ltd) Koodaideri Iron Ore Project is located approximately 110 km north-west of Newman in the Pilbara region of Western Australia. During detailed ecological studi

    Aug 24, 2015

  • AUSIMM
    Ethics in the Minerals Industry

    By L Brodie-Hally

    In the early-1990s, Tad Golosinski, the former the head of mining department at WASM participated in a review mining engineering courses in Australia. The review team asked various industry executives

    Jan 1, 2002

  • AUSIMM
    Determining the Pressure Pulse for an Air Blast

    By M A. Tuck

    Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo

    Jul 1, 2013

  • AUSIMM
    Hydrothermal Rare Earth Element Mobilisation Processes in the Yinachang Fe-Cu-(REE) Deposit, South-west China

    By X Li, M-F Zhou

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Yinachang deposit in south-west China contains large amounts of Fe, Cu and rare earth e

    Mar 18, 2015

  • AUSIMM
    The Solid Foundation of a Career

    The following paper outlines the types of employment immediately available to graduates following their university degree, a discussion on mine manager requirements, mentions career advancement and ti

    Jan 1, 2006

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011