Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite Feed

    By R Jones

    OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene

    Jul 11, 2011

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground Mine

    By S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti

    Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an

    Nov 5, 2014

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Fundamental Sampling Error and Sampling Precision in Resource Estimation – A Discussion

    By N Schofield

    For the sampling of particulate materials in mineral exploration and mining, the fundamental sampling error (FSE) introduced by Gy is a measure of the constitutional heterogeneity of the sample lot an

    Aug 22, 2011

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia

    By C F. Stokes

    The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)

    Aug 22, 2011

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Methodology development of electrical conductivity measurements for non-ferrous slags

    By L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens

    As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco

    Jun 19, 2024

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Managing steep seam dips and floor shears related dragline bench and lowwall instabilities

    By J Li, J Regan, D Payne

    The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge

    Nov 29, 2022

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Prognostic models for electroslag remelting process and slag engineering

    By D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar

    Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree

    Aug 21, 2024

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    An Experiment to Validate Bubble Sizing Techniques Using Bi-Modal Populations of Known Proportions

    A novel approach to validate size distributions obtained from bubble sizing techniques is introduced. The experimental rationale consists in verifying whether the output features the anticipated bi-mo

    Jan 1, 2005

  • AUSIMM
    Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining Investment

    By J P. Sykes, C Gemell, A Trench

    The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing

    Jun 22, 2016