Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minimising Sediment Mobilisation within the Ranger Project AreaBy Armstrong AB
It has been identified that particulate matter in the form of suspended solids and bed load has the ability to adsorb heavy metals. Each year Ranger Uranium Mines Pty Ltd (RUM) identifies potentia
Jan 1, 1984
-
Planning a New Mining TownThe Hail Creek coking coal deposits are situated in Central Queensland, inland from the port of Mackay. A joint venture of Australian and Japanese companies has been formed to examine the feasibili
Jan 1, 1973
-
Thermal Processing of Petroleum Fly Ash for Vanadium RecoveryThermal Processing of Petroleum Fly Ash for Vanadium Recovery
Sep 13, 2010
-
Groundwater Prospecting in the Arid Regions of Western AustraliaBy Barnett J. C
The arid and semi-arid region of Western Australia occupies about two-thirds of the State equivalent to an area of about 1.8 million sqkm. Groundwater demand in this area has historically been linked
Jan 1, 1988
-
Planning Of Exploratory Drilling Programs, Logging And Sampling Of Explotary Drill Holes For CoalBy Svenson D
For fully effective information to be obtained from exploratory drilling for coal, drilling programs should be planned systemati- cally in successive stages, on the basis of existing geological crit
Jan 1, 1977
-
Telecommunications Facilities for Remote ComputingComputers represent substantial capital investment. A better return on that invest- ment comes from more effective use of the computer's facilities. By using Telecom's data communications
Jan 1, 1983
-
Prediction of Longwall Support Loading at Southern Colliery, QueenslandBy McNabb KE, Ward B, Dyer G
Roof conditions at Southern Colliery, the second longwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. In
Jan 1, 1992
-
Support Performance Prediction for Hydraulic FillsBy Hill J. R M, McDonald M. M
A prediction technique for support perfor- mance of hydraulic backfill in narrow stopes is applied to two stopes separated vertically by a sill pillar. Predicted stope wall closures and fill pressu
Jan 1, 1973
-
Rise and Pillar Rill Stoping at Golden Crown MineBy Rogers M, Sullivan B
Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15
Jan 1, 1993
-
The New Central Crushing Plant at Lake View and star LimitedTo follow the development of the central crushing plant it is necessary briefly to outline the history of the Lake View and Star Limited. This Company, when first constituted, took over the properties
Jan 1, 1948
-
Cut and Cover Tunnelling on the Melbourne Underground Rail Loop ProjectBy Johns A. L
The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor
Jan 1, 1981
-
Mathematical Modelling of Heat Transfer in Flash-Smelting BurnersBy Taylor R. N
Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti
Jan 1, 1992
-
Experience With Production in a Gassy Environment, Oaky North MineProblems associated with gas management become more significant as exploitation of coal reserves in the Bowen Basin in Australia becomes deeper. At Oaky North mine, relocation of production from one a
Jan 1, 2005
-
The Chromite Resources of Papua New GuineaDeposits of chromite are in associated with ophiolite complexes in Papua New Guinea. No deposits which are currently exploitable have been recognised, but large resources that may be economic in t
Jan 1, 1987
-
Microseismic Monitoring for Gas Outbursts at Leichhardt CollieryBy Ahmed M, Leung L
A program of microseismic noise monitor ing for gas outbursts, in conjunction with other mining engineering measurements and observations, is being undertaken at Leichhardt colliery in Queensland.
Jan 1, 1980
-
Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving
Jan 1, 1986
-
KR process-production of hot metal on the basis of non-coking coalBy Kepplinger W
The KR Process is a joint development by VOEST-ALPINE, Austria and its subsidiary company KORF ENGINEERING, Germany. This new technology allows production of hot metal on the basis of non-coking
Jan 1, 1986
-
Recent Developments in Blast Furnace PracticeDevelopments in furnace construction and design have been very rapid in recent years. Larger furnaces operating at high top pressures with much improved burdens are giving extremely high productio
Jan 1, 1972
-
Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesBy Baafi E. Y
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res
Jan 1, 1998
-
Probablistic Analysis of Risk in Mining Projects - As Easy as 123By Dorricott M. G, McAllister J
This paper is concerned with the application of a probabilistic approach to the risk assessment of mining projects.In current practice, sensitivity analysis is the most commonly used deterministic app
Jan 1, 1992