Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised Emulsions

    By K G. Fleetwood

    This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener

    Nov 8, 2011

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)

    By Aiming Z, Shenyi S, Xialei W

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill

    Jan 1, 1998

  • AUSIMM
    Effect of pebbles on collisional environment in a ball mill using composite media (balls/pebbles)

    By S Nkwanyana, I Govender

    Batch experiments in a 0.6 m diameter mill have shown that improvements of about 13 per cent in the efficiency of energy utilisation can be realised in ball mills by replacing 25 per cent of the ball

    Aug 24, 2022

  • AUSIMM
    The Testing of Autogenous Grinding in Laboratory and Pilot Scale and the Design of Full Scale Comminution Circuits

    By Morsky P, Kalapudas R, Natunen H, Virtanen M

    The development of autogenous grinding modification in Outokumpu, known with the name 'Outogenius Comminution', was 'reversed'. At first the metallurgists studied and tested tens

    Jan 1, 1993

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    Oxygen Pressure Leaching of a Bulk Flotation Concentrate form a Complex Cu-Pb-Zn Sulphide Ore

    By Canterford J. H, Sparrow G. J, Dyson N. F

    Pressure leaching of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore was carried out at 150 and 190¦C under 1050 kPa oxygen overpressure in 1 L and 4 L titanium autoclave

    Jan 1, 1989

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Computer-Assisted Photointerpretation of Geological Lineaments: Perception Method

    By Huntington J. F, Green A. A

    The quality of a photointerpreter's anno- tation of an image may be displayed by writing maps in which the pixels are shaded according to the number of times a pixel was seen to be on a featur

    Jan 1, 1977

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    Airborne contaminant monitoring strategy and technology

    By J H. J Holtzhausen

    Never has there been more focus on the health, safety, and well-being of our employees at the workplace. Ever evolving expectations of individuals, companies and clients are shaping regulatory reviews

    Oct 12, 2022

  • AUSIMM
    Aeromagnetometry and Aeroradiometry of Gabal El Kahfa Ring Complex, Eastern Desert, Egypt

    By Rabie A. S, Fouad K. M, Ammar A. A

    The existence of Gabal El Kahfa ring complex, located in the Eastern Desert of Egypt, has been ascertained from aeromagnetic and aeroradiometric survey data as well as by aerial photography. Two m

    Jan 1, 1988

  • AUSIMM
    Flow Characteristics Of Coal-Oil Slurries (93622aca-5458-44f1-8c01-7e66485fc372)

    By Barro L

    There is currently a world wide interest in coal-oil technology as the search continues for alternative energy sources to reduce the consumption of petroleum crude. An important aspect of this coa

    Jan 1, 1980

  • AUSIMM
    Determination of Blast Induced Damaged Zones in Pillars by Seismic Imaging

    By Theophili CN, Kapenis AP

    Seismic tomographic imaging has been applied to determine the blast induced damage zones in bauxite pillars in underground mining. At the retreating stage, when pillar dimensions are reduced from 8

    Jan 1, 1995

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • AUSIMM
    Resources of Mineral Sands, What of their Future?

    In 1985 BMR assessed Australia's economic demonstrated resources of mineral sands as follows: rutile 8.0 Mt, ilmenite 41.4 Mt, zircon 11.5 Mt, and monazite 229 000 tonnes. These resources are

    Jan 1, 1986

  • AUSIMM
    Rb-Sr and Pb Isotope Data from the Northampton Block, Western Australia

    By Blockley J. G, Laeter J. R

    The history of the Ph-Cu-Zn mineralisation in the orthampton Block of Western Australia has been further investigated. It was hoped that (1) Rh-Sr studies on partially-remelled granulites, wall-rocks

    Jan 1, 1985

  • AUSIMM
    Geology and Exploration of the Hamata Deposit

    By Young DJ

    Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con

    Jan 1, 1991

  • AUSIMM
    Mt Whaleback Mine Dewatering

    By Nidagal V

    This paper discusses the dewatering strategy adopted and the considerations and procedures required to incorporate a dewaterinq scheme into the Mt Whaleback mining operation. It concludes that in

    Jan 1, 1986