Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The 250 million ton per annum spatial digital twinBy M Pomery
BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and
Sep 18, 2023
-
Internalising Ecological Costs in Evaluating and Planning a Mining ProjectBy Q Wang
Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co
Sep 26, 2011
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
The Practical Implementation of Dewatering and Depressurisation in Large Open PitsAll large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv
Jan 1, 2003
-
PC-BC: A Block Cave Design and Draw Control SystemThis paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the
Jan 1, 2000
-
Evaluating the Inclusion of the Implementation Variability into Fragmentation ModellingBy H Parra, D Zenteno
Fragmentation modelling has been in use in the mining industry for a long time; however, there are still some aspects to tackle with regard to its use for strategic/planning and day-to-day purposes.On
Aug 24, 2015
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Accelerated aging testing of geomembranes for tailings liquorBy J Folwell, G Phillips, F Gassner
Geomembranes selected for various applications often start with considering target properties developed by industry organisations such as Geosynthetic Research Institute (GRI), and test methods develo
Jul 1, 2021
-
Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock HoistBy J Harmse
This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem
Jan 1, 2005
-
Improving the dewatering efficiency of clay-rich tailings in saline waterBy D Liu, M Edraki, L Berry
The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater
Jul 23, 2018
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012
-
Recent Process Developments at the Phu Kham Copper-Gold Concentrator, LaosBy P Walker, I Crnkovic, D Bennett
The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex
Oct 29, 2012
-
Recruiting for an Underground Workforce at CanningtonBy A G. L Pratt, M S. Kemp
BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to
Jan 1, 1998
-
Cooling Pathways for Deep Australian Longwall Coal Mines of the FutureBy B Belle, M Biffi
Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu
Jul 1, 2013
-
Ernest Henry Underground Mine – Access and Support Infrastructure DesignBy P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th
Jan 1, 1925
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
A Study into Bonding within Reduced Titanomagnetite-Coal CompactsBy R J. Longbottom
In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this
Jul 11, 2011
-
Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applicationsBy C T. Portelli
Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor
Sep 18, 2023