Search Documents

  • SME-ICGCM
    Effect of Full-Extraction Underground Mining on Ground and Surface Waters A 25-Year Retrospective

    By Francis S. Kendorski

    Over the past 25 years, the present author has written with several co-authors a series of papers beginning with the landmark paper in the 1st International Conference on Ground Control in Mining in 1

    Jan 1, 2006

  • IOM3
    Performance monitoring of rock engineering systems using neural networks

    By J. A. Hudson, D. L. Millar

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: Rock engineering system performance monitoring using neural netw

    Apr 1, 1994

  • SME
    A Computer-Based Hazard-Awareness Assessment Program For Surface Mines – Preprint 97-120

    By C. J. Bise, D. A. Poukhovski

    Two integral components of the 30 CFR 48 training requirements mandated for new miners, newly employed experienced miners, and the annual refresher training of all miners are hazard recognition and pr

    Feb 24, 1997

  • NIOSH
    RI 9402 - Materials of Construction for High-Salinity Geothermal Brines

    By John P. Carter

    The U.S. Bureau of Mines conducted research to determine suitable construction materials for use in brine and steam environments produced from high-salinity geothermal brines. The high-temperature, hi

    Jan 1, 2010

  • SAIMM
    Optimizing yield of metallic zinc tapped from a zinc smelter by studying factors causing zinc losses to dross - Synopsis

    By A. de Meyer

    Zincor experienced significant losses of metallic zinc to dross during the melting of zinc cathode plates. In this study five factors affecting the formation of dross are identified from literature. D

    Jan 1, 2010

  • AUSIMM
    Political and Social Aspects of Present and Future Tunnelling

    Our modern cities are almost incapable of sustaining themselves without subsurface infrastructure, which is not identifiable at first glance. This very soon becomes evident when the chaotic conditions

    Jan 1, 1999

  • SME
    Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges

    By James D. Nickerson

    Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea

    Jan 1, 2009

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • AIME
    The Stock Exchange and Its Relation to the Mining Industry

    By FRABK HERVEY PETTINGELL

    THE stock exchange and its functions is about as well understood by the average individual as the fourth dimension. What is a stock exchange? Divested of the rules and regulations by which it is gover

    Jan 1, 1925

  • AUSIMM
    Thermodynamics of Non-Cyanide Gold Solvents

    Thermodynamics of Non-Cyanide Gold Solvents The present status of the raw material base in the gold industry requires specific ways to recover gold and silver from ores. Most gold is closely associat

    Sep 13, 2010

  • AUSIMM
    Audits of Mine Health and Safety using Quality Management Techniques

    The use of walk-through inspections, approvals and ad hoc investigations to ensure risk is kept within acceptable levels is reaching its limits of effectiveness. Further improvement in occupational he

    Jan 1, 1998

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990

  • AUSIMM
    Geology of the C.S.A. Mine, Cobar, N.S.W.

    The C.S.A. copper-lead-zinc mine, located 7 miles north of Cobar in central-western New South Wales, is the largest known mineral ocurrence in the Cobar mining field. The generally discordant orebodie

    Jan 1, 1970

  • SME
    The Price Is Right?Planning Large Water Tunnel Contracts In New York

    By Christian Maguire

    Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure

  • NIOSH
    Development Of New Protocols To Evaluate The Transverse Loading Of Mine Ventilation Stoppings

    By T. J. Batchler, T. M. Barczak

    The Code of Federal Regulations (CFR) requires that the transverse load capacity of stoppings be equal to or greater than traditionally accepted in mine controls, which for block stoppings is generall

  • AUSIMM
    Optical Computing Systems Applied to Engineering and Geological Fabric Analyses

    An optical computing system was used to determine spacings and frequencies in geological fabrics and engineering joint fabrics.Three-dimensional arrays of joints were plotted on an equal-area net. Dir

    Jan 1, 1970

  • AUSIMM
    HBI - Hot Briquetting of Direct Reduced Iron Technology and Status of Industrial Application

    Hot briquetting is a reliable, fully developed industrial concept for the passivation of direct reduced iron produced with the various processes of direct reduction. During hot briquetting, the larg

    Jan 1, 1999

  • IOM3
    Petrography and X-ray computerized tomography applied as an integral part of a rock mechanics investigation of discontinuities

    By R. Sweennen, A. Vervoort, J. Caers

    A case study is presented of the mechanical behaviour of fractures in the Westphalian A and B siliciclastic succession of mud-, silt- and sandstones with intercalating coal layers in the Campine basin

    Jun 19, 1905

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000