Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Removal Of Heavy Metals From Acidic Manganese Chloride Solution By Ion Exchange ResinsBy C. Villa Diniz, A. H. Martins, Fiona M. Doyle
It is proposed that battery grade MnO2 can be produced directly from a manganese ore from Azul Mine in Brazil, by leaching with HCI to remove heavy metals selectively. We are working to find a way of
Jan 1, 1999
-
Operational Performance of Grinding Rolls at Cyprus Sierrita CorporationBy Loren G. Thompsen
The first high pressure grinding roll in a copper mine was commissioned at Cyprus Sierrita in July 1995. This grinding roll is the world's biggest operating unit. It has a roll diameter of 2.4 me
Jan 1, 1997
-
Surface Structural DamagesBy W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng
5.1 INTRODUCTION There are several types of surface ground disturbances, each of which is immediately transmitted to surface structures and causes damage of various forms, depending on the location o
Jan 1, 1992
-
Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023By Chris Lynagh, Collin Schroeder
Determining the best excavation method is a critical step in successful tunnel construction. In rock tunneling, several factors can dictate the excavation method, such as: (1) rock characteristics, (2
Jun 13, 2023
-
A 108-in Storm Tunnel Underneath Active Taxiways and Apron at O’Hare International Airport - NAT2024By Tim M. Benson, Adam L. Lamanna, Carolina Martinez-Gutierrez, Mark J. Stephani
The Lower Concourse C Extension (LCE) 108-in Storm Sewer consists of a 2,797-foot long, 27 to 55-foot deep, 108-in I.D. storm sewer tunnel. Situated beneath active taxiways and a terminal apron at Har
Jun 23, 2024
-
Evaluation Of Nutrient And Biological Amendments On Waste Rock (1c23ea01-8ab2-4c72-b387-9de91a6dd9c5)By T. W. Meikle
Three nutrient amendments and a biological seed inoculant were evaluated for use in establishing vegetative cover on waste rock substrates. Randomized blocks were placed on three substrates. Treatment
Jan 1, 1999
-
Planning Of Support Work In Underground Coal Mines Using MANSUPP (0730a175-0132-449a-a9c0-68a923e3ad35)By J. M. Dean
The MANpower SUPport Program (MANSUPP), a part of the Mine Management Support System (MMSS), allows an underground coal mine site user to determine manpower requirements for production support work by
Jan 1, 1992
-
Mine-to-mill Improvements Anchored In Drilling Accuracy - SME Annual Conference 2023By A. Almeida, D. Castro, K. Ingmarsson, D. Ferreira, R. Tamir
Mine-to-mill improvements can be initiated at any stage, but it is our assertion that drilling accuracy is a practical anchor in any operating mine or quarry for a structured continuous improvement pr
Feb 1, 2023
-
Construction Challenges of the Anderson Dam Tunnel Project - NAT2022By Ron Drake
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An
Dec 1, 2022
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
Development of Strategies to Reduce Ventilation and Heating Costs in a Swedish Sublevel Caving Mine - a Unique Case of LKAB’s Konsuln Mine (Mining, Metallurgy & Exploration)By A. Halim, A. Martikainen, S. GYAMFI
This paper outlines a unique case of the development of strategies to reduce ventilation and heating costs in Konsuln iron ore mine in northern Sweden. The mine, located just south of Luossavaara-Kiir
Dec 23, 2021
-
Planning Considerations For Quartz Hill Mine Southeast AlaskaBy K. M. Reim
Planning the development of the Quartz Hill molybdenum open pit mine in Southeast Alaska required a number of special considerations. Located in mountainous glaciated terrain, about 3.8 m (150 in.) of
Jan 1, 1988
-
Purification Of Molybdenite Concentrates By A Continuous Sulfation-leaching ProcessBy I. WILKOMIRSKY, J. BECKER, F. Parada
The current processes that aim to purify molybdenite concentrates are not able to dissolve some copper compounds, hence limiting the processes. Typically, the copper content results are from 2 up to 4
Jan 1, 2023
-
Material Handling Techniques To Maximize Silt Participation In The Fuel Blend For A Waste Coal Fired Generating FacilityBy H. R. Thompson
The Grant Town Power Plant is a nominal 80 MW (net) Waste Coal-Fired Electric Generating Plant which is located in northern West Virginia, approximately 15 miles southwest of Morgantown. The Steam Gen
Jan 1, 1996
-
Thriving In A World Talc MarketBy R. J. Piniazkiewicz
Talc orebodies are mined in Asia, Australia, Europe, North America, and South America. Operators in North America must be efficient quality suppliers to thrive in a talc market in which many overseas
Jan 1, 1993
-
The Market Development Of A Dangerous Waste -A Case Study Of Magnesium SludgeBy R. J. Roman
During the refining of primary magnesium metal: a spent flux (sludge) is produced which is considered a dangerous waste by the Washington State Department of Ecology. Four years of research, testing a
Jan 1, 1988
-
Time-Dependent Rock Mass Motion At The Homestake Mine, Lead, SDBy T. Brady, J. Johnson, J. Whyatt, B. Pariseau, M. Stahl
An elastic-viscoplastic material model allows for time-dependent rock mass motion in proportion to excess stress above the elastic limit. The model produces rounded stair-step curves of displacement
Jan 1, 2000
-
Sand Bed Filtration Of Colloidal Particles ? IntroductionBy Terry A. Ring
Sand bed filters are used to remove large and small particles from liquid streams. The large particles are removed by the straining action of the filter bed and the small particles are removed by part
Jan 1, 1982
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
The Availability of Federal Mineral Estate in Alaska, Arizona, Colorado, Idaho, Nevada, New Mexico, Oregon, Utah and WashingtonBy Robert G. Bottge, Paul C. Hyndman, Don J. Barnes, Clark A. Roberts
The effect of Federal restrictions on Federal mineral estate in Alaska and the Western States is being addressed by systematic, State-by- State studies. The Bureau of Mines has inventoried and classif
Jan 1, 1991