Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Some Environmental Aspects Of Large Scale Oil Shale MiningBy Paul L. Russell
U. S. petroleum demand has increased at a rate greater than that of domestic production. A domestic energy source that is under serious consideration to augment present supply is oil shale. The Gre
Jan 1, 1974
-
Water Management at Minera YanacochaBy A. Cavero, M. Diaz
The annual rainfall at Minera Yanacocha's gold mining operations in northern Peru averages 1.2 meters. The influx of water into the operations is higher than losses to evaporation and by ore abso
Jan 1, 1998
-
Some Practical Aspects of Open Pit Mine PlanningBy Wen-Long Cai, A. Frederick Banfield
This paper investigates, through case studies on a porphyry copper and a coal deposit, the differences and relevances between an approximate production schedule approach, i.e., the best case and the w
Jan 1, 1996
-
Economic Mineral Deposits and Their OccurrenceBy F. N. Earll
4.1 – DEFINITIONS 4.1.1-MINERALS, ROCKS, ORES AND NONMETALLIC MINERALS F. N. EARLL A mineral is a naturally occurring inorganic element or compound. Most minerals are distinctly crystalline
Jan 1, 1973
-
Carbonatite-Related Fluorspar Deposits At Okorusu, Namibia: Control Of Ore Emplacement By Selective , Carbonatite Replacement, Electron Microprobe Analyses Of Carbonatite Minerals, And HomogenizationBy Purnima A. Shivdasan
The fluorspar deposits at Okorusu, Namibia are closely related to an alkaline igneous ring complex of late Cretaceous age (125±7 Ma). The fluorite ores consist of relatively fine-grained purple replac
Jan 1, 2005
-
Discussion - Use of a microcomputer in the design and selection of materials hoisting systemsBy J. D. Patsey, G. T. Lineberry
A.E. Hall The authors are to be commended for their attempt to provide a convenient piece of software for preliminary drum hoist specification. This field has received little attention in recent ye
Jan 8, 1987
-
Sublevel Carving – IntroductionBy E. W. Cokayne
GENERAL DESCRIPTION OF THE METHOD The original application of sublevel caving was in ground so weak that it would collapse even in small headings when the support was removed. Heavily tim¬bered dri
Jan 1, 1982
-
A Study Of Axial Backmixing In A 0.76-M Flotation ColumnBy A. M. Taweel, M. T. Ityokumbul, A. I. A. Salama, M. W. Mikhail
The liquid-phase mixing within CANMET's Western Research Centre's (WRC) 0.76-m-diem pilot-plant flotation column was characterized using a salt tracer. The process variables studied were fro
Jan 1, 1996
-
Discussion - Short Scale Spatial Variability Of Sulfur In A Coal SeamBy R. W. Barbaro, R. V. Ramani, K. V. K. Prasad, P. T. Luckie
Discussion by A. Unal Barbaro et al. (1990) implemented a tedious study aimed at delineating the short-scale spatial variability of sulfur in a coal seam. It is not possible, however, to extend the
Jan 1, 1992
-
Fly Ash Pelletizing ? Introduction:By Donald C. Violetta
During 1963 more than 200 million tons of coal was consumed by the public utility industry. Ash residual, from the burning of this coal has caused disposal problems. In order to prevent air pollution,
Jan 1, 1966
-
Stochastic Continuous Modeling for Pillar Stress Estimation and Comparison with 2D Numerical, and Analytical Solutions in an Underground Stone MineBy Juan J. Monsalve, Mario Karfakis, AMAN SONI, Nino Ripepi, Jim Hazzard
Pillar collapses are events that due to their severe consequences can be classified as high risk. The design of pillars in underground room-and-pillar operations should migrate to risk-based design ap
Sep 24, 2022
-
Imaging Spectroscopy: A New Screening Tool for Mapping Acidic Mine WasteBy Gregg A. Swayre, Roger N. Clark, Stephen J. Sutley, Kathleen S. Smith
Imaging spectroscopy is a relatively new remote sensing tool that provides a rapid method to screen entire mining districts for potential sources of surface acid drainage. An imaging spectrometer know
Jan 1, 2000
-
AA Pad Reclamation Performance Review At Barrick’s Goldstrike MineBy K. L. Myers, R. Espell, C. Deringer
Construction of the AA Pad reclamation was completed in the fall of 2000. Seeding of the ET cover began in the late fall of 2000 and continued through May of 2001. On Saturday afternoon, June 1, 2002,
Jan 1, 2003
-
Long-term Subsidence Monitoring Over a Longwall Coal Mine in Southern IllinoisBy Brenda B. Mehnert
Long-term monitoring is necessary to successfully develop predictive subsidence models. Thus, the Illinois Mine Subsidence Research Program (IMSRP) has documented subsidence over a longwall mine in so
Jan 1, 1986
-
High Altitude Passive Water Treatment System Design And Construction For Leach Pad EffluentBy K. Whiting, R. Huffsmith, R. Olsen, D. Adams
Long-term closure alternative selection for heap leach pad effluent is a daunting task. Passive water treatment, if designed with enough long-term capacity, can minimize long term O&M while meeting w
Jan 1, 2002
-
Bed Filtration Of Colloidal ParticlesBy T. A. Ring
The bed filtration of colloidal particles has been modeled by performing a differential particle balance. The balance considered the localized particle deposition rate to be the sum of three rate resi
Jan 1, 1983
-
The Development Of High Productivity Shotcreting At The Cannon MineBy J. Baz-Dresch
A custom-designed shotcrete system, consisting of an 8-m3 (10-yd3) transit mixer and a shotcrete spray boom carrier, is used bya 2-man crew to transport and place up to 25 m3 (32 yd3) of steel-fiber r
Jan 1, 1991
-
Optimized Counting Intervals For Concentration Measurement Of The Decay Products Of Radon And Thoron In A Uranium MineBy Stephen Pogorski, Colin R. Phillips, Atika Khan
An optimized counting scheme for a mixture of radon daughters and thoron daughters typical of Ontario mines, developed in a previous study, was experimentally examined under mine conditions. The count
Jan 1, 1981
-
Construction of a Long Coal Mine Decline in Southwest VirginiaBy Alwyn Protheroe, Steve Smith, Herbert Jr. Gibson
In September of 2000, Cowin and Company, Inc., contracted with Paramont Coal Corporation to construct a large decline approximately 820 m (2,700 feet) in overall length at a grade of 8 degrees to the
Jan 1, 2003
-
02 And CO2 Consumption With Steady-State, Continuous Flow BioleachingBy Donald A. Dahlstrom, Soumitro Nagpal, Timothy Oolman
Bacterial oxidation of a pyrite/ arsenopyritic gold-ore concentrate was carried out with continuous flow operation in 14 liter (1.4x10-2 m3) mechanically agitated reactors. 02 and C02 uptakes were de
Jan 1, 1990