Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Centrifuge Test on Reduction of Lateral Flow of Liquefied Ground by Stabilized Columns
By Shinji Sassa, Naoki Takahashi, Eiji Kohama, Wakaki Tsuda, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Abstract Deep mixing method has been employed increasingly in recent years as a countermeasure against subsoil liquefaction. Column-type solidification, however, has been thought to have little effec
Jan 1, 2014
-
A Review Of Diaphragm Wall Construction-White Swan Hotel ? Synopsis
By Q. M. Huang
In 1979 our company undertook the project of infra-structural work of White Swan Lake Hotel, (International class ) Guangzhou. Visit to the site showed that it was situated at the riverside, covering
Jan 1, 2010
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation
By Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?
By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs
Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS
Jan 1, 2019
-
Design and Quality Control of Soil Mix Walls for Earth and Water Retaining Structures
By Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock
"In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to
Jan 1, 2015
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc
By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships
By Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013
-
Session 17 "Grout for Enhancement of Piles and Piers"
By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003
-
2D and 3D Finite Element Analysis for Cantilever Slurry Walls in Cohesionless Soil
By Mostafa Mossaad, Ali Helwa, Manal Salem
Support of excavation (SOE) design practice tends to model SOE elements using two-dimensional (2D) analyses to avoid the complexity associated with three-dimensional (3D) analyses. Such practice overl
Jan 1, 2018
-
Model Specification Helical Anchor Foundations Tension Applications
"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2016
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)
By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts
By Josef K. Alter
Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr
Jan 1, 2011
-
Assessing the Applicability of Thermal Response Testing to Energy Piles
By C. Guney Olgun, Fleur Loveridge, Tracy Brettmann, William Powrie
"Abstract Deep foundations are increasingly being used, not just to carry structural loads, but also to act as heat exchangers as part of a ground source heat pump system. Such foundations, often call
Jan 1, 2014
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava
By J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, Vietnam
By Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen
"Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and
Jan 1, 2015
-
Session 24 "Compaction Grouting and Consensus Guide"
By Richard Berry
The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th
Feb 10, 2003
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow Rock
By J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
Stability Analysis Of Jack-Up Rig At The Bohai Oil Field ? Introduction
By H. Cheng
The Bohai Oil Company has applied all together 11 jack-up oil drilling rigs (movable platforms) (1) which can be classified in terms of their forms of foundations into two types: the integral mat and
Jan 1, 2010
-
Nailed It! The Great Wall of the Chinese Embassy
By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations
By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1