    Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical Consultant

    By Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell

    In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur

    May 1, 2022

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Slurry Trench Design and Construction in Difficult Conditions

    By Peter Deming

    "PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear

    Jan 1, 2006

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions

    By Michael Hughes, Selva Selvamohan, Ray Costa

    "Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back

    Jan 1, 2015

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    Dynamic Testing For Bored Pile Bearing Capacity - Summary

    By Jörn M. Seitz

    Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use

    Jan 1, 1987

  • DFI
    Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles

    By Koichi Kobayashi

    Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora

    Jan 1, 2006

  • DFI
    Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit

    By Wanchai Teparaksa

    Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large

    Jan 1, 2002

  • DFI
    Helical Pile Foundations at Tangier Island Substation

    By Jeff Wilkinson, Brandon Walter

    "A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp

    Jan 1, 2017

  • DFI
    Dynamic Characterization Of Drilled Shafts On Doremus Avenue Bridge

    By Martina Balic

    Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid

    Jan 1, 2004

  • DFI
    Hand-Dug Underreamed Piles At Embankment Place, London

    By W. J. Grose

    The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th

    Jan 1, 1989

  • DFI
    2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2

    By Bengt H. Fellenius

    Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl

    Jan 1, 1994

  • DFI
    St. Croix Bridge, Minnesota: The Influence of Construction on the Axial Resistance of Drilled Shaft Foundations in Weak Sandstone

    By William G. Ryan, David S. Graham, Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "The St. Croix River Crossing project on the Minnesota-Wisconsin border has been in the process of planning and public debate for two decades, with several changes in alignment. During the course of t

    Jan 1, 2015

  • DFI
    Level Crossing Removal Project – Package 1

    By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong

    "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin

    Jan 1, 1900

  • DFI
    Concrete Piles Driven In A Coral Sand

    By L. D. Johnson

    12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid

    Jan 1, 1993

  • DFI
    Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington

    By David G. Winter

    The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t

    Jan 1, 1990

  • DFI
    Evaluating Degree of Consolidation of Soft Soil by Using Asaoka, Hyperbolic and Back Analysis Method

    By Aminul Islam, Vinay M. Kumar

    "About 100 Hectares of land reclamation over the very soft to soft marine clay at Uran Creek in Maharashtra is planned. The depth of marine clay varies from 10m to 24m as observed from the geotechnica

    Jan 1, 2017

  • DFI
    Foundation Innovations Ensure Successful Bridge Replacement

    By Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin

    "Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l

    Jan 1, 2015

  • DFI
    Hybrid Design Approach for Anchored Retaining Walls in Complex Geology

    By Christopher J. Ramsey, Don W. Dotson

    "An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga